PRR Project
REMODELAÇÃO E ADAPTAÇÃO DAS INSTALAÇÕES SANITÁRIAS PUBLICAS DO PAVILHÃO GIMNODESPORTIVO PARA ACESSIBILIDADE A PE
Project sheet
Name
REMODELAÇÃO E ADAPTAÇÃO DAS INSTALAÇÕES SANITÁRIAS PUBLICAS DO PAVILHÃO GIMNODESPORTIVO PARA ACESSIBILIDADE A PETotal project amount
6,67 thousand €Amount paid
2 thousand €Non-refundable funding
6,67 thousand €Loan funding
0 €Start date
04.09.2022Expected end date
31.08.2023Dimension
ResilienceComponent
Social InterventionInvestment
360° AccessibilityOperation code
02/C03-i02/2021.P808Summary
A intervenção prevê a remodelação total das instalações sanitárias onde se verifica a necessidade de reorganização do espaço para que seja possível a instalação de um sanitário que cumpra as condições para ser utilizado por pessoas com mobilidade condicionada, nomeadamente:- A instalação sanitária é específica para pessoas com mobilidade condicionada e irá servir para o sexo masculino e para o sexo feminino estando integrada nas restantes instalações sanitárias;- O espaço interior tem a dimensão de 2,22m de largura por 2,20m de comprimento;- Instalação de sanita acessível com altura do piso ao bordo superior do assento de 0,45 m;- Existência de zonas livres, de acordo com o especificado no n.º 4.1.1, de ambos os lados e na parte frontal da sanita;- Instalação de barras de apoio lateral, adjacentes à zona livre, e rebatíveis na vertical;- Instalação de um lavatório acessível que não interfere com a área de transferência para a sanita;- No espaço que permanece livre após a instalação dos aparelhos sanitários é possível inscrever uma zona de manobra para rotação de 360°.Prevê-se ainda a instalação de uma plataforma elevatória para escadas, do tipo SUPRA da THYSSENKRUPP, ou equivalente, incluindo todos os trabalhos, acessórios e materiais necessários ao seu correto funcionamento.Considerando que no complexo desportivo existem piscinas cobertas e descobertas, prevê-se também a aquisição de um elevador portátil para piscina do tipo GOLFINHO SPORTS Ref. ECOPOOL ou equivalente, incluindo cinto de 5 pontos, para que possa ser utilizado em ambos os equipamentos.
Beneficiaries
The two types are::
- Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
- Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.
Call for applications
As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.
The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.
Final evaluation score
The components for calculating the assessment score can be found in the selection criteria document mentioned below.
Selection criteria
Beneficiaries
Intermediate beneficiaries
Procurement
Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.
To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.
Geographic distribution
6,67 thousand €
Total amount of the project
Percentage of the amount already paid for implementing projects
, 30 %,Where was the money spent
By county
1 county financed .
-
Sousel 6,67 thousand € ,