Jump to main page content
Loading...

Project sheet

Name

Instalações Sanitárias Acessíveis (Reitoria)

Total project amount

6,67 thousand €

Amount paid

2 thousand €

Non-refundable funding

6,67 thousand €

Loan funding

0 €

Start date

01.01.2021

Expected end date

31.12.2025

Dimension

Resilience

Component

Social Intervention

Investment

360° Accessibility

Operation code

02/C03-i02/2021.P762

Summary

Para dar cumprimento ao objetivo e de acordo com o representado no desenho 4.01, são propostas as seguintes intervenções: 1. É melhorado o acesso ao interior do compartimento, através do rebaixamento do pavimento para a cota do corredor de acesso. 2. De modo a garantir uma passagem útil mínima de 77 cm, a porta de acesso é alterada no seu funcionamento e deslocada. Em vez de uma porta de batente a abrir para o interior, o projeto propõe uma porta de correr, cuja calha deverá estar ligeiramente inclinada de modo a que o vão normalmente esteja na posição fechado. 3. Será criada uma rampa de acesso com uma inclinação máxima de 10% e uma extensão de 1,60m, dando cumprimento ao exposto na legislação. Esta rampa irá permitir o acesso autónomo por parte de pessoas com mobilidade condicionada ao espaço comum de lavatórios e cabines sanitárias. 4. Após a rampa, na zona comum de lavatórios é possível realizar uma manobra de rotação de 360º com 1,50m de diâmetro. 5. O acesso ao interior da cabine/ instalação sanitária adaptada para pessoas com mobilidade condicionada será realizado por uma porta de correr com passagem livre superior a 80 cm. O fecho livre/ ocupado desta porta irá permitir que a mesma seja aberta pelo exterior em caso de necessidade através de desaperto do trinco. 6. A cabine possui no seu interior uma zona de manobra de 360º com 1,50m, e o seu equipamento (sanita, barras, lavatório, etc.) está posicionado de modo a dar cumprimento ao exposto na legislação em vigor. As torneiras deverão ser temporizadas e automáticas, assim como o dispensador de sabão. Esta cabine será ainda equipada com campainha de alarme.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

65,0
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

6,67 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 30 %,

Where was the money spent

By county

1 county financed .

  • Coimbra 6,67 thousand € ,
Source AD&C, EMRP
10.05.2024