PRR Project
Acessibilidades_ EB1 da Azaruja
Project sheet
Name
Acessibilidades_ EB1 da AzarujaTotal project amount
6,67 thousand €Amount paid
2 thousand €Non-refundable funding
6,67 thousand €Loan funding
0 €Start date
01.01.2021Expected end date
31.12.2025Dimension
ResilienceComponent
Social InterventionInvestment
360° AccessibilityOperation code
02/C03-i02/2021.P599Summary
A Escola EB1 da Azaruja, localizada na Rua José João Perdigão, n.º 20, Azaruja, concelho de Évora, com as coordenadas 38.70489,-7.78097; confina com a rua principal de entrada na povoação, a qual tem a particularidade de se tratar de uma via com muita circulação automóvel. O acesso à porta pedonal principal faz-se através de passeio estreito daquele arruamento e através de escadaria com 5 degraus. Por este acesso ter problemas de segurança devido ao fluxo de viaturas e devido ao desconforto na subida dos degraus, os alunos entram e saem através do portão de acesso automóvel no fundo do logradouro. Este portão, confina com rua secundária sem passeio, a 50ms do edifício, na zona mais baixa do recreio, onde se acumulam águas pluviais. Pelos motivos acima referidos, é necessária a abertura de portão pedonal no muro existente, com condições de conforto e funcionalidade. Acresce ainda, que a soleira do edifício se encontra elevada em relação ao arruamento principal e ao recreio, sendo o acesso ao edifício em ambas as situações feito através de diversos degraus, não estando cumpridas as regras de acessibilidade (DL163/2006 de 8 de Agosto). Por outro lado, a escola não dispõe de instalação sanitária para pessoas com mobilidade condicionada. Face às caraterísticas existentes atualmente no recinto escolar, propõe-se através da abertura de portão pedonal desenvolver duas rampas no interior do recreio que vencerão os desníveis existentes entre: • o arruamento e o recreio – 0,37ms; • o arruamento e o piso da escola – 0,44ms. Acresce ainda, no âmbito das ações e investimentos a executar no presente projeto, intervenção que permita adaptar a instalação sanitária existente no recinto escolar; a instalação sanitária cujas caraterísticas pós execução de obra permita o acesso para pessoas com mobilidade condicionada.
Beneficiaries
The two types are::
- Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
- Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.
Call for applications
As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.
The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.
Final evaluation score
The components for calculating the assessment score can be found in the selection criteria document mentioned below.
Selection criteria
Beneficiaries
Intermediate beneficiaries
Procurement
Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.
To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.
Geographic distribution
6,67 thousand €
Total amount of the project
Percentage of the amount already paid for implementing projects
, 30 %,Where was the money spent
By county
1 county financed .
-
Évora 6,67 thousand € ,