Project sheet

Name

ELEVADOR DO SALÃO CULTURAL DA GAFANHA DA ENCARNAÇÃO

Total project amount

6,67 thousand €

Amount paid

2 thousand €

Non-refundable funding

6,67 thousand €

Loan funding

0 €

Start date

01.01.2021

Expected end date

31.12.2025

Dimension

Resilience

Component

Social Intervention

Investment

360° Accessibility

Operation code

02/C03-i02/2021.P560

Summary

A intervenção proposta consiste na requalificação e ampliação do edifício que partilha as valências de Salão Cultural e de Unidade de Cuidados e Saúde Personalizados da Gafanha da Encarnação. Tal desígnio resulta da obsolescência geral do edifício existente, tornado impreterível dotar o equipamento das condições atualmente exigíveis de conforto, segurança, inclusão e eficácia funcional e energética. Relativamente à Unidade de Saúde, no sentido de garantir à comunidade local o acesso à prestação de cuidados de saúde de qualidade, foi proposto uma reconfiguração do antigo Posto Médico, segundo as diretrizes da autoridade competente (ARS-Centro) e cujas intervenções foram alvo de candidatura a fundos comunitários, encontrando-se a mesma em análise. O Salão Cultural da Gafanha da Encarnação, enquanto espaço de dinamização de atividades e práticas culturais, é fundamental para o fortalecimento da identidade da comunidade local. A intervenção pretende adaptar o equipamento às atuais necessidades técnico-espaciais, transformando-o num ponto de encontro comunitário. Para tal, deverá ser garantida a sua funcionalidade, segurança, acessibilidade e dignidade tipológica e morfológica. Esta intervenção não foi alvo de qualquer candidatura a fundos comunitários, suportando o Município o investimento neste espaço na sua totalidade. Convém mencionar que todo o projeto foi pensado para tornar acessível o edifício do Salão Cultural, nomeadamente com: - Um lugar de estacionamento dedicado a pessoas de mobilidade condicionada, assim como um percurso acessível até às rampas regulamentares que permitem vencer o desnível da cota de soleira do edifício; - A instalação rampas com inclinação muito suave - A instalação de novas instalações sanitárias (devidamente dimensionadas, equipadas e acessíveis a pessoas de mobilidade condicionada). - Adaptação do átrio de acesso ao piso superior (cujas escadas existentes associadas a um elevador garantem a acessibilidade plena); - Corredores e áreas de circulação pensadas e desenhadas de modo a responder às necessidades das pessoas com mobilidade condicionada.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

50,0
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

6,67 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 30 %,

Where was the money spent

By county

1 county financed .

  • Ílhavo 6,67 thousand € ,
Source AD&C, EMRP
17.05.2024