Name

Mercado Municipal de Chaves

Total project amount

5,6 thousand €

Amount paid

1,68 thousand €

Non-refundable funding

5,6 thousand €

Loan funding

0 €

Start date

01.01.2021

Expected end date

31.12.2025

Dimension

Resilience

Component

Social Intervention

Investment

360° Accessibility

Operation code

02/C03-i02/2021.P544

Summary

O projeto de intervenção no Mercado Municipal de Chaves visa a realização das seguintes ações: - Zona de entrada no edifício (na qual existe um degrau, que impede o fácil acesso ao edifício) - instalar uma rampa com as dimensões de 14,53 x 1,66 m, de modo a que o acesso da via pública para o interior seja feito sem obstáculos. - Acesso ao pátio interior (no qual existe a condicionante de ter um degrau em toda a sua extensão) - instalação de duas rampas e respetivos corrimãos. Uma das rampas terá as dimensões de 3,38 x 1,66 m, com corrimão com extensão de 2,27m. A outra rampa será acessível através da construção de uma plataforma com as dimensões de 3,50 x 4,00 m e zona rampeada com dimensões de 4, 00 x 2,17 m, com corrimão com extensão de 2,78m. - Corrimão em rampa existente (algumas áreas do edifício já estão dotadas de rampas, porém, algumas carecem de um apoio, para que a circulação através delas seja feita de forma segura) - instalação de corrimão com a extensão de 4,30m. Estes trabalhos têm uma comparticipação financeira solicitada de 6.457,32€, a qual corresponde ao orçamento global previsto, em conformidade com a seguinte descrição detalhada dos trabalhos a realizar: Rampas na via pública - 438,38€ Rampas em edifícios - 411,66€ Corrimão e barras de apoio - 5.222,10€ Trabalhos imprescindíveis e associados (fornecimento e execução de elevação de piso em betão) - 85,00€; Trabalhos imprescindíveis e associados (montagem e desmontagem do estaleiro, entre outros) - 300,00€;

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

65,0
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

5,6 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 30 %,

Where was the money spent

By county

1 county financed .

  • Chaves 5,6 thousand € ,
Source AD&C, EMRP