Jump to main page content
Loading...

PRR Project

ESTeSC IPC: Edifício Francisco Grade - Intervenção no Edifício para melhoria das Acessibilidades

Project sheet

Name

ESTeSC IPC: Edifício Francisco Grade - Intervenção no Edifício para melhoria das Acessibilidades

Total project amount

7,98 thousand €

Amount paid

4,86 thousand €

Non-refundable funding

7,98 thousand €

Loan funding

0 €

Start date

01.01.2021

Expected end date

31.12.2025

Dimension

Resilience

Component

Social Intervention

Investment

360° Accessibility

Operation code

02/C03-i02/2021.P521

Summary

1. Percurso acessível – Estacionamento A solução prevê a criação de dois lugares de estacionamento junto ao Edifício Francisco Grade. Os trabalhos incluem: - Reparação de pavimento em zona danificada, com abertura de caixa e colocação de massas frias de betuminoso. - Fornecimento e colocação de sinal vertical de informação de parque, conforme DR 22-A/98 de 1.8. alterado pelo DR 6/2019, em chapa de ferro com 2mm de espessura com proteção anticorrosiva e sinais serigrafados, com painel adicional com marcação de ‘2 lugares’ mod. 11D e postes D=60 com 1,5mm, incluindo maciço de fundação. - Fornecimento de marcação horizontal com tinta termoplástica refletora de aplicação a quente, em linhas brancas de marcação dos lugares e faixa lateral. - Fornecimento de marcação horizontal com tinta termoplástica refletora de aplicação a quente, de 2 símbolos internacional de deficiente. - Execução de rebaixamento de passeio com pavimento podotátil. 2. Percurso acessível – rampa galeria coberta entre edifícios A rampa da galeria coberta entre edifícios tem o pavimento danificado e não tem faixas contrastantes e antiderrapantes. Assim, a Gestão do edifício considera ser uma das situações mais urgentes a resolver em matéria de acessibilidade. O revestimento da rampa será em tapete de borracha. Características técnicas: - Fornecimento e execução de pavimento com tapete de borracha cinza da Casa dos Tapetes ref.ª Omega ou semelhante, incluindo remates em inox, regularização, colas de assentamento e soldaduras de juntas de acordo com os pormenores de projeto e as especificações do Caderno de Encargos.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

65,0
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

7,98 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 60,9 %,

Where was the money spent

By county

1 county financed .

  • Coimbra 7,98 thousand € ,
Source AD&C, EMRP
17.05.2024