Jump to main page content
Loading...

Project sheet

Name

ESEC IPC: Cantina - Intervenção no Edifício para melhoria das Acessibilidades

Total project amount

7,15 thousand €

Amount paid

2,15 thousand €

Non-refundable funding

7,15 thousand €

Loan funding

0 €

Start date

01.01.2021

Expected end date

31.12.2025

Dimension

Resilience

Component

Social Intervention

Investment

360° Accessibility

Operation code

02/C03-i02/2021.P519

Summary

1. Percurso acessível - Rampas Os edifícios devem ser dotados de pelo menos um percurso, designado de acessível, que proporcione o acesso seguro e confortável das pessoas com mobilidade condicionada entre a via pública, o local de entrada/saída principal e todos os espaços interiores e exteriores que os constituem. Na entrada da Associação Estudantes estamos a propor a colocação de uma rampa para aceder a soleira de entrada no edifício, garantindo que vence os 0,28m com inclinação regulamentar (6%). [NTA 2.5.] A rampa prevista cumpre com as normas técnicas de acessibilidade. [2.5.1, 2.5.4., 2.5.7a10] O revestimento da rampa será em pedra serrada, é um material contínuo e antiderrapante. Serão colocadas as faixas, no seu início e fim da rampa e escadas, constituídas por um material de revestimento de textura diferente e cor contrastante (material podotátil) relativamente ao pavimento adjacente. [NTA 2.5.10] Serão colocados corrimãos de ambos os lados da rampa. Características técnicas: - Revestimento da rampa e paredes em pedra calcária 3cm espessura, com estereotomia e dimensões definidas em desenhos, serrada. Para a execução da rampa será ainda necessário reposicionar o banco e papeleira.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

65,0
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

7,15 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 30 %,

Where was the money spent

By county

1 county financed .

  • Coimbra 7,15 thousand € ,
Source AD&C, EMRP
17.05.2024