PRR Project

Empreitada "Lagoa + sustentável - Fase 1 - Zona de influência do ponto de entrega de Alporchinhos"

Project sheet

Name

Empreitada "Lagoa + sustentável - Fase 1 - Zona de influência do ponto de entrega de Alporchinhos"

Total project amount

600 thousand €

Amount paid

542,19 thousand €

Non-refundable funding

600 thousand €

Loan funding

0 €

Start date

01.01.2021

Expected end date

31.03.2026

Dimension

Resilience

Component

Water management

Investment

Algarve Regional Water Efficiency Plan

Operation code

01/C09-i01.01/2021.P1

Summary

A operação contempla, como elemento estrutural, a substituição/renovação de condutas e a criação de 10 ZMC’s, essenciais ao processo de controlo da rede, resultando, da conjugação dos estudos realizados com os objetivos e tipologias de investimentos considerados no aviso, numa intervenção que se carateriza pelas seguintes componentes: 1. CONSTRUÇÕES DIVERSAS – Substituição/renovação de condutas para criação das ZMC, num investimento de 390.923,75 € 2. EQUIPAMENTO BÁSICO, no investimento de 132.201,25 €: a. Aquisição e instalação, em cada local de controlo, de equipamentos de medição de caudal, do tipo caudalímetros, que permitem a medição rigorosa de caudais, essencial: i) a monotorização e o controlo de perdas de água e ii) controlo do volume de água não faturada; b. Aquisição e instalação de equipamentos de registo e transmissão de dados ou dataloggers, permite recolher de forma automática dados de consumo, pressão e outras variáveis, contribuem para a criação de um sistema fiável de registo e transmissão de dados valiosos sobre o sistema de abastecimento. Enquanto complemento dos caudalímetros, os dataloggers permitem uma obtenção de dados em tempo real, que tratados nas aplicações informáticas, possibilitam, entre outras, identificar as zonas da rede de distribuição onde se perde mais água, ou mesmo a quantificação dos caudais perdidos versus a extensão da rede a analisar, o que uma mais rápida e eficaz intervenção sobre as roturas de condutas; c. Aquisição e instalação de válvulas redutores de pressão, permitem a gestão ativa de pressão da rede, que contribui objetivamente para a diminuição de perdas reais de água na rede de distribuição; d. Aquisição de equipamentos móveis para localização de fugas permitem obter precisão sobre a localização das fugas de água, informação essencial a um rápido e eficiente intervenção, para a resolução do problema; 3. SOFTWARE INFORMÁTICO - Aquisição de software que permita o tratamento dos dados recolhidos e gere informação de suporte à gestão do sistema, no valor de investimento de 72.500,00 €; 4. EQUIPAMENTO INFORMÁTICO - Aquisição de hardware de suporte à instalação e operacionalização do software adquirido, no valor de investimento de 4.375,00 €.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

3,2
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

600 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 90,4 %,

Where was the money spent

By county

1 county financed .

  • Lagoa 600 thousand € ,
Source AD&C, EMRP
18.09.2024