Project sheet

Name

Centro Tecnológico Especializado de Informática

Total project amount

1,06 million €

Amount paid

0 €

Non-refundable funding

1,06 million €

Loan funding

0 €

Start date

01.01.2022

Expected end date

31.12.2025

Dimension

Resilience

Component

Qualifications and Skills

Investment

Modernising education and vocational training services and establishments

Operation code

01/C06-i01.01/2022.P3989

Summary

Para o projeto do CTE Informática, fez-se um levantamento dos investimentos necessários e o levantamento dos gastos necessários para a implementação e boa execução do projeto. Para fazer face ao investimento, a FORAVE tem capacidade para recorrer a capital próprio e a financiamento bancário. Estrategicamente, estabeleceu um plano de investimento que ascende a 1.099.923,02€, sem IVA, distribuído ao longo de 2 anos do projeto, de acordo com prioridades estabelecidas e em função da articulação ponderada das 3 áreas de investimento a que a Escola se propõe: 1 - Aquisição de equipamentos destinados à prática educativa e formativa, no valor total de 826.306,10€. Este valor destina-se à aquisição de máquinas, equipamentos e hardware específicos para o CTE. Incluí também a aquisição de equipamento informático. Programou-se a aquisição do equipamento ao longo dos 2 anos do projeto, de acordo com as prioridades definidas pela equipa técnica da área do CTE. 2 - Modernização da infraestrutura tecnológica, diretamente relacionada com a instalação e funcionamento dos equipamentos destinados à prática educativa e formativa, no valor total de 203.170,51€. Este valor está destinado a obras de modernização e adaptação das instalações elétricas, da rede informática e de software, de modo a se ajustar aos equipamentos a instalar nos laboratórios, oficinas e salas informáticas. 3 – Apetrechamento e requalificação de espaços e oficinas, diretamente relacionados com a prática educativa e formativa, no valor total de 70.446,41€. Este valor corresponde à aquisição de mobiliário considerado necessário para equipar os diversos espaços a afetar ao CTE, nomeadamente secretárias, cadeiras e armários. Todos os investimentos propostos estão dentro dos parâmetros de elegibilidade e cumprem com o limite estabelecido na candidatura para a tipologia dos CTE Informáticos de 1.100.000€. O orçamento foi devidamente aprovado pela Direção Executiva, que é o órgão competente para a decisão.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

73,6
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

1,06 million €

Total amount of the project

Where was the money spent

By county

1 county financed .

  • Vila Nova de Famalicão 1,06 million € ,
Source AD&C, EMRP
16.05.2024