Jump to main page content
Loading...

Project sheet

Name

CTE_AEDM

Total project amount

978,35 thousand €

Amount paid

293,5 thousand €

Non-refundable funding

978,35 thousand €

Loan funding

0 €

Start date

01.01.2022

Expected end date

31.12.2025

Dimension

Resilience

Component

Qualifications and Skills

Investment

Modernising education and vocational training services and establishments

Operation code

01/C06-i01.01/2022.P1580

Summary

Conscientes da importância de projetos desta natureza, para a formação dos nossos alunos, bem como da importância das estratégias de aprendizagem ativa e de dinâmicas de sala de aula em que o foco é o aluno e não o professor, o projeto foi pensado de forma a permitir uma grande flexibilidade e ergonomia das salas de aula, permitindo uma grande interação entre todos (alunos/professor e alunos/alunos), bem como o desenvolvimento da autonomia e da responsabilidade. O nosso projeto inclui orçamentos para a modernização da parte elétrica amplificando a capacidade instalada e para a aquisição de equipamentos que permitam uma maior eficiência energética, que promovam as competências verdes, o cumprimento das metas do Pacto Ecológico Europeu em alinhamento com os contributos para os Objetivos de Desenvolvimento Sustentável e valorizem os estilos de vida saudável e a vivência territorial em comunidades sustentáveis. Relativamente ao mobiliário, tivemos o cuidado de solicitar orçamentos a empresas conceituadas e certificadas na área do mobiliário educativo, foram feitos estudos de pormenor, com visitas ao local pelos técnicos especializados que reuniram com a equipa responsável pela candidatura ao CTE no sentido de selecionar o mobiliário mais adequado à situação (nível etário dos alunos, grau de ensino, especificidade da área tecnológica e da implementação das novas práticas de aprendizagem ativa). No sentido de promover a constante melhoria do sucesso educativo dos alunos e propiciar aos professores ferramentas tecnológicas inovadoras para a utilização de metodologias de aprendizagem ativas, os equipamentos solicitados às empresas especializadas são atuais e incorporam as últimas inovações tecnológicas das várias tecnologias apresentadas, cumprindo as normas regulamentares aplicáveis. Foi dada preferência por produtos com uma expectativa de vida útil elevada, com capacidade de reparação.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

78,4
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

978,35 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 30 %,

Where was the money spent

By county

1 county financed .

  • Vila Nova de Gaia 978,35 thousand € ,
Source AD&C, EMRP
16.05.2024