PRR Project
PAOITI AMP Centro-Oriental
Project sheet
Name
PAOITI AMP Centro-OrientalTotal project amount
142,92 thousand €Amount paid
0 €Non-refundable funding
142,92 thousand €Loan funding
0 €Start date
01.04.2022Expected end date
31.12.2025Dimension
ResilienceComponent
Social InterventionInvestment
Integrated operations in deprived communities in the Metropolitan Areas of Lisbon and PortoOperation code
01/C03-i06.03/2022.P356Summary
Tendo, este PAOITI, por objetivo central promover a integração social de comunidades desfavorecidas, que vivem em situação de maior vulnerabilidade no território, numa perspetiva abrangente, tem necessariamente como pressuposto de intervenção uma abordagem articulada e holística que permita criar as condições sociais, institucionais, urbanísticas e de participação, necessárias à superação das principais situações de constrangimento que afetam os grupos sociais alvo. Esta intervenção, que se quer abrangente, não poderá ficar alheia ao reforço das capacidades inerentes da comunidade, dotando-a de respostas, ferramentas e mecanismos que facilitem a superação das adversidades.Os principais eixos de intervenção que orientam o plano, de acordo com o diagnóstico efetuado, recaem 13 eixos de intervenção, a saber: 1. Saúde física e mental2. Envelhecimento saudável 3. Adoção de estilos de vida mais saudável4. Prevenção de comportamentos de risco5. Deficiência e incapacidade6. Cidadania, Participação comunitária e Voluntariado 7. Mobilidade, Acessibilidade e Segurança 8. Inclusão de grupos especialmente vulneráveis (pessoas em situação de sem-abrigo, migrantes)9. Educação, desenvolvimento de competências e empregabilidade10. Empreendedorismo e inovação social11. Capacitação do tecido institucional12. Cultura, Património e Arte 13. Ambiente e transição climáticaOs Investimentos previstos distribuem-se de forma equilibrada entre ações infraestruturas e imateriais que visem a implementação de ações em espaços devidamente equipados e adaptados.
Beneficiaries
The two types are::
- Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
- Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.
Call for applications
As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.
The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.
Final evaluation score
The components for calculating the assessment score can be found in the selection criteria document mentioned below.
Selection criteria
Beneficiaries
Intermediate beneficiaries
Procurement
Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.
To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.
Geographic distribution
142,92 thousand €
Total amount of the project
Where was the money spent
By county
1 county financed .
-
Gondomar 142,92 thousand € ,