Project sheet

Name

PASSEIOS NA PRAIA DA BARRA - 3.ª FASE

Total project amount

303,14 thousand €

Amount paid

90,94 thousand €

Non-refundable funding

303,14 thousand €

Loan funding

0 €

Start date

01.01.2021

Expected end date

31.12.2025

Dimension

Resilience

Component

Social Intervention

Investment

360° Accessibility

Operation code

01/C03-i02/2021.P480

Summary

Corresponde o presente projeto de execução à execução e requalificação de passeios no lugar da Praia da Barra, em especial na definição da salvaguarda da circulação pedonal, nomeadamente nos seguintes arruamentos urbanos: - Rua da Praia (Tramo Sul/Poente) - Rua do Pocinho - Av. Vasco da Gama – Troço II - Rua dos Emigrantes - Rua de Ílhavo - Rua das Ostras Dada a diversidade do tipo de acabamentos nos passeios existentes, pretende-se agora, além de completar os novos troços, também uma uniformização de acabamentos final do conjunto dos mesmos. Não se prevê qualquer intervenção ao nível das faixas de rodagem, de forma a aproveitar-se os pavimentos existentes. Serão igualmente definidas placas de estacionamento adjacentes aos passeios, segundo uma lógica de circulação urbana do conjunto, e de apoio ao estacionamento a residentes e não residentes. Os passeios permitem uma definição adequada dos percursos de peões de uma forma segregada e em condições de segurança e nas travessias das faixas de rodagem os passeios serão rebaixados ao nível da faixa de rodagem de forma a facilitar a circulação de pessoas de mobilidade reduzida. Nas entradas dos acessos particulares, os pavimentos dos passeios serão reforçados com uma camada de base dupla para maior durabilidade e serão também rebaixados para garantir um melhor acesso às propriedades. Não esquecendo obviamente as travessias de peões, convém referir que nos arruamentos alvo de intervenção não existia qualquer passadeira de peões, o que se refletia numa falta de segurança numa zona urbana por excelência. Para a execução do presente projeto será realizado um procedimento de contratação por Concurso Público, cujo valor base é de € 406.601,00 + IVA, encontrando-se o projeto de execução aprovado.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

75,0
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

303,14 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 30 %,

Where was the money spent

By county

1 county financed .

  • Ílhavo 303,14 thousand € ,
Source AD&C, EMRP
17.05.2024