Rua Ilha do Príncipe, nº 7 - 4º andar

Total project amount

48 thousand €

Amount paid

0 €

Non-refundable funding

48 thousand €

Loan funding

0 €

Start date

30.03.2026

Expected end date

30.06.2026

Dimension

Resilience

Component

National Health Service

Investment

Apoio à reforma no domínio da saúde mental

Operation code

19/C01-i03/2026.P31989

Summary

No âmbito da adaptação dos fogos para habitação partilhada, encontram se previstas e/ou em execução as seguintes intervenções e fornecimentos:• Instalação de estores blackout, com o objetivo de garantir o adequado controlo da iluminação natural, privacidade e conforto dos residentes;• Aplicação de guardas de proteção, sempre que necessário, assegurando condições de segurança em vãos, varandas ou zonas expostas;• Verificação das condições de acesso por elevador, designadamente no que se refere à existência, funcionamento e acessibilidade, sempre que aplicável ao edifício;• Fornecimento de eletrodomésticos essenciais, garantindo a plena funcionalidade da habitação, nomeadamente: ? Frigorífico/congelador;? Placa de cozinha, forno e exaustor;? Máquina de lavar roupa;Realização de obras de conservação, atualmente em curso, destinadas à melhoria do estado geral dos apartamentos, sem implicar alterações estruturais ou modificações do uso habitacional existente.Está igualmente previsto mobilar os apartamentos, assegurando um ambiente funcional, prático e acolhedor, adequado ao uso como habitação partilhada. O mobiliário e a decoração serão simples, de fácil manutenção e compatíveis com os espaços existentes.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

100,0
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

48 thousand €

Total amount of the project

Where was the money spent

By county

1 county financed .

  • Lisboa 48 thousand € ,
Source EMRP
14.07.2026
All themes
Transparency without leading