PRR Project
ERR - Casa dos Plátanos
Project sheet
Name
ERR - Casa dos PlátanosTotal project amount
500 thousand €Amount paid
0 €Non-refundable funding
500 thousand €Loan funding
0 €Start date
02.02.2026Expected end date
30.06.2026Dimension
ResilienceComponent
National Health ServiceInvestment
Apoio à reforma no domínio da saúde mentalOperation code
18/C01-i03/2026.P30663Summary
A intervenção proposta incide sobretudo na conservação e recuperação dos elementos existentes — incluindo rebocos, vãos, pilastras e demais componentes arquitetónicos — garantindo a sua estabilidade, segurança e valorização patrimonial. As ações de reabilitação previstas procuram também promover a melhoria do desempenho energético e da durabilidade dos materiais, sem comprometer a autenticidade do edifício e a sua expressão arquitetónica original. O programa funcional prevê 4 quartos individuais, 8 quartos duplos, 4 instalações sanitárias (utentes) preparadas para pessoas com mobilidade reduzida, 3 salas de estar e 1 sala de refeições, 1 sala para atividades ocupacionais e convívio, cozinha/copa de receção, pátio central. Prevê ainda lavandaria, zona de arrumos, 1 instalação sanitária para o pessoal da Cozinha e Lavandaria, 3 gabinetes técnicos e 1 instalação sanitária, dividida por masculino/ feminino para a área dos Técnicos, bem como 1 Instalação Sanitária, junto da entrada. As circulações, rampa e acessos são dimensionadas para pessoas com mobilidade reduzida.A proposta integra, ainda, zonas verdes localizadas no interior do lote da Estrutura Residencial de Reintegração (ERR), destinadas ao usufruto direto dos residentes e concebidas como espaços de permanência, lazer e contacto com o exterior. A área exterior inclui a implantação de um espaço destinado a compartimento para armazenagem de contentores de resíduos sólidos, bem como 4 lugares de estacionamento.
Beneficiaries
The two types are::
- Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
- Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.
Call for applications
As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.
The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.
Final evaluation score
The components for calculating the assessment score can be found in the selection criteria document mentioned below.
Selection criteria
Beneficiaries
Intermediate beneficiaries
Procurement
Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.
To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.
Geographic distribution
500 thousand €
Total amount of the project
Where was the money spent
By county
1 county financed .
-
Lisboa 500 thousand € ,