Information portal on various topics of management of public resources of the Portuguese State

Project sheet

Name

Requalificação do CRI de Castelo Branco

Total project amount

84,5 thousand €

Amount paid

0 €

Non-refundable funding

84,5 thousand €

Loan funding

0 €

Start date

03.11.2025

Expected end date

03.03.2026

Dimension

Resilience

Component

National Health Service

Investment

Modernização e renovação de áreas hospitalares e equipamentos para hospitais

Operation code

05/C01-i04/2025.P24166

Summary

A intervenção visa adequar as infraestruturas físicas e tecnológicas do CRI às atuais exigências de segurança, acessibilidade e eficiência, criando condições mais dignas e sustentáveis para utentes e profissionais. O edifício, que apresenta sinais de desgaste e limitações técnicas, será alvo de uma requalificação integral das áreas interiores e técnicas, garantindo maior conforto térmico, eficiência energética e qualidade ambiental.Os trabalhos incluem a substituição do pavimento existente em linóleo por manta vinílica homogénea, resistente e de fácil higienização, que contribui para o isolamento acústico e a durabilidade dos espaços. Está também prevista a renovação total do sistema de climatização e ventilação (AVAC), assegurando uma melhor qualidade do ar interior e cumprimento das normas em vigor, bem como a substituição da iluminação convencional por tecnologia LED, promovendo uma redução significativa do consumo energético. Ao nível exterior, será instalada proteção solar nos vãos mais expostos, através de lâminas orientáveis em alumínio anodizado, permitindo o controlo térmico e luminoso.Com um prazo de execução de 90 dias e um investimento global estimado em 84.500€, esta requalificação reforça a capacidade de resposta do ICAD na região, promovendo a equidade territorial, a coesão social e o acesso a cuidados especializados de proximidade. Melhora o acolhimento e a eficácia terapêutica, cria ambientes mais humanizados e contribui para a resiliência e modernização do Serviço Nacional de Saúde, alinhando-se com os objetivos estratégicos do Plano de Recuperação e Resiliência (PRR), particularmente na Componente C01 – Reforço do SNS.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

2,5
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

84,5 thousand €

Total amount of the project

Where was the money spent

By county

1 county financed .

  • Castelo Branco 84,5 thousand € ,
Source EMRP
24.11.2026
All themes
Transparency without leading