Information portal on various topics of management of public resources of the Portuguese State

Project sheet

Name

Requalificação na Unidade Terapêutica Arco Íris – Coimbra

Total project amount

43,95 thousand €

Amount paid

21,98 thousand €

Non-refundable funding

43,95 thousand €

Loan funding

0 €

Start date

03.11.2025

Expected end date

31.12.2025

Dimension

Resilience

Component

National Health Service

Investment

Modernização e renovação de áreas hospitalares e equipamentos para hospitais

Operation code

05/C01-i04/2025.P24155

Summary

O presente investimento, promovido pelo Instituto para os Comportamentos Aditivos e as Dependências, I.P. (ICAD), tem como objetivo a requalificação da Unidade Terapêutica Arco Íris, em Coimbra.O edifício da Unidade Arco Íris apresenta sinais de obsolescência estrutural e construtiva, resultantes de intervenções anteriores que provocaram infiltrações e deterioração generalizada de tetos e paredes do último piso, comprometendo a segurança e o conforto térmico. A empreitada prevê o reforço estrutural e a renovação integral da cobertura, a melhoria dos sistemas de drenagem, águas e saneamento, e a correção de patologias construtivas que limitam a utilização plena do espaço. Estas ações visam garantir condições adequadas de internamento, trabalho e segurança, assegurando a conformidade com as normas técnicas aplicáveis às unidades de tratamento e reabilitação do SNS.Esta intervenção representa uma mais-valia direta para as populações da Região Centro, melhorando o acesso equitativo a cuidados especializados de reabilitação e reinserção e reduzindo desigualdades territoriais. A modernização da Unidade Arco Íris reforça a capacidade de resposta do SNS na área dos comportamentos aditivos, aumenta a qualidade e continuidade dos cuidados e contribui para melhorar a adesão e o sucesso terapêutico dos utentes, frequentemente em situação de vulnerabilidade social.Com um investimento total de 43.950 €, englobando projeto de execução, fiscalização e empreitada, prevê-se o início da obra em novembro de 2025 e a sua conclusão em dezembro de 2025. Este projeto traduz uma aposta na resiliência, sustentabilidade e modernização do sistema público de saúde, assegurando melhores condições de acolhimento, de trabalho e de integração comunitária, em plena coerência com os objetivos estratégicos do PRR, nomeadamente o reforço da coesão social, territorial e ambiental.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

2,5
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

43,95 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 50 %,

Where was the money spent

By county

1 county financed .

  • Coimbra 43,95 thousand € ,
Source EMRP