Information portal on various topics of management of public resources of the Portuguese State

Project sheet

Name

Requalificação da Unidade de Desabituação do Norte

Total project amount

243,79 thousand €

Amount paid

121,89 thousand €

Non-refundable funding

243,79 thousand €

Loan funding

0 €

Start date

01.11.2025

Expected end date

30.06.2026

Dimension

Resilience

Component

National Health Service

Investment

Modernização e renovação de áreas hospitalares e equipamentos para hospitais

Operation code

05/C01-i04/2025.P24153

Summary

A presente operação, promovida pelo Instituto para os Comportamentos Aditivos e as Dependências, I.P. (ICAD, I.P.), enquadra-se na Componente 01 – Serviço Nacional de Saúde do Plano de Recuperação e Resiliência (PRR), no âmbito do investimento “Modernização e renovação de áreas hospitalares e equipamentos”. O projeto visa a requalificação da Unidade de Desabituação do Norte (UD Norte), situada em Matosinhos, uma estrutura essencial da rede pública de respostas no domínio dos comportamentos aditivos e dependências (CAD), assegurando cuidados especializados de internamento em desabituação e reabilitação.A intervenção responde a necessidades identificadas de degradação estrutural e funcional da unidade, nomeadamente falhas no sistema de climatização (AVAC), infiltrações e danos em zonas interiores, que comprometiam a qualidade do ar, o conforto térmico e a segurança dos utentes e profissionais. O projeto permitirá restaurar as condições de funcionamento, conforto e eficiência energética, garantindo a sustentabilidade e continuidade dos cuidados prestados.As principais ações incluem:– Substituição do chiller por equipamento de elevada eficiência energética e fluido frigorigéneo de baixo GWP;– Revisão e modernização da unidade de tratamento de ar novo (UTA) e ventiladores de extração;– Reposição do sistema de aquecimento central;– Reparações elétricas e recuperação de zonas interiores afetadas por infiltrações, com materiais sustentáveis e de baixo impacto ambiental.Com um investimento total de 294.473,27 €, o projeto será executado entre novembro de 2025 e junho de 2026, incluindo projeto de execução, empreitada, fiscalização e segurança.A operação contribui diretamente para os objetivos do PRR e do Plano Nacional para a Redução dos Comportamentos Aditivos e das Dependências 2030 (PNRCAD-2030), reforçando a qualidade e a equidade dos cuidados de saúde, promovendo a transição verde e digital, e assegurando uma maior resiliência e sustentabilidade das infraestruturas públicas de saúde.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

2,5
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

243,79 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 50 %,

Where was the money spent

By county

1 county financed .

  • Matosinhos 243,79 thousand € ,
Source EMRP
24.11.2026
All themes
Transparency without leading