Information portal on various topics of management of public resources of the Portuguese State

Project sheet

Name

ULSASI – Reforço da capacidade assistencial dos CSP

Total project amount

2,02 million €

Amount paid

504,47 thousand €

Non-refundable funding

2,02 million €

Loan funding

0 €

Start date

01.01.2026

Expected end date

30.06.2026

Dimension

Resilience

Component

National Health Service

Investment

Primary Health Care with greater responsiveness rates

Operation code

03/C01-i01/2022.P29438

Summary

A Unidade Local de Saúde de Amadora/Sintra, E.P.E. pretende modernizar e reforçar a capacidade assistencial dos cuidados de saúde primários nos concelhos de Amadora e Sintra, através de um projeto que abrange 51 unidades funcionais. Com um investimento superior a 2 milhões de euros, esta intervenção prevê a aquisição de 4.721 equipamentos clínicos, administrativos, tecnológicos e de apoio, permitindo dotar as unidades de melhores condições técnicas e operacionais. O objetivo é assegurar uma resposta mais eficiente, segura e acessível, ajustada às exigências atuais e às expectativas da população.O projeto distribui-se por quatro tipologias principais de investimento. A maior parcela corresponde ao equipamento básico e clínico (1.144.530,16 €), que inclui dispositivos como monitores de sinais vitais, otoscópios, dopplers, marquesas elétricas, cadeiras de rodas, equipamentos de reabilitação e dispositivos para saúde materno-infantil e cuidados domiciliários. Na tipologia de outros equipamentos (831.900,00 €), destacam-se os sistemas de climatização e diversos equipamentos de apoio logístico às unidades. O investimento em equipamento informático e de comunicação (27.200,00 €) contempla, entre outros, impressoras multifunções, datashows, televisores e sistemas de videoconferência, essenciais para a digitalização e modernização dos processos assistenciais e formativos. Finalmente, o equipamento administrativo (14.259,92 €) assegura mobiliário e materiais de apoio às áreas de receção, gabinetes, salas de espera e espaços de formação.Com esta modernização, a ULSASI dá um passo decisivo na consolidação de um modelo de cuidados mais próximo, integrado e centrado no utente. A qualificação das infraestruturas permitirá melhorar significativamente a experiência dos utentes e criar melhores condições para os profissionais, contribuindo para um sistema de saúde mais sustentável, equitativo e preparado para os desafios da atualidade e do futuro.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

2,5
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

2,02 million €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 25 %,

Where was the money spent

By county

1 county financed .

  • Amadora 2,02 million € ,
Source EMRP
07.08.2026
All themes
Transparency without leading