Name

EFICIÊNCIA ENERGÉTICA NA SANIPIRES

Total project amount

34,03 thousand €

Amount paid

0 €

Non-refundable funding

34,03 thousand €

Loan funding

0 €

Start date

25.11.2025

Expected end date

30.06.2026

Dimension

Climate Transition

Component

Energy efficiency in buildings

Investment

Energy efficiency in buildings used by the service sector

Operation code

01/C13-i03/2022.P988

Summary

A operação aqui apresentada, visa a prossecução das seguintes medidas e respetivos objetivos:1- MEDIDA DE MELHORIA 1- TIPOLOGIA DE INTERVENO 1.3 Aplicação ou substituição de isolamento térmico em coberturas, paredes ou pavimentos, bem como a substituição de portas de entradaMedida calculada tendo em conta a aplicação de Painel Sandwich com 0,06m de espessura. Este isolamento será colocado e envolverá todas as situações de pontes térmicas planas (quando aplicável). Esta medida reduz as perdas térmicas bem como o risco de condensações interiores, melhorando as condições de conforto dos espaços. A presente medida de melhoria apresenta um investimento de aproximadamente 26 360 , garantindo uma redução anual na fatura de energia de 532 . Tendo em conta o investimento inicial e a poupança anual de energia elétrica, prevê-se um período de retorno de aproximadamente 49,5 anos.Com a implementação desta medida prevê-se uma redução do consumo de energia elétrica de 3 301 kWh/ano. A redução no consumo de energia elétrica reflete-se no valor do RIEE passando de 1,10 para 1,02, mantendo-se a classe C. MEDIDA DE MELHORIA 2- Tipologia de Investimento 3.1 Instalação de sistemas de produção de energia elétrica para autoconsumo, através de fontes renováveis com e sem armazenamento de energia.A medida visa a instalação de uma unidade de produção para autoconsumo, de modo a satisfazer parte das necessidades elétricas do edifício. As tecnologias fotovoltaicas permitem transformar diretamente a radiação solar em energia elétrica.Para o edifício em estudo, considerou-se a instalação de 25 painéis solares fotovoltaicos monocristalinos de marca e modelo JA Solar JAM72S30-540/MR, com potência de 540 W, a instalar na cobertura do edifício, ocupando uma área de 64,6 m2. O custo associado a esta medida é de 20250 , com uma redução anual estimada da fatura energética de aproximadamente 2941 . Tendo em conta o investimento inicial e a poupança anual de energia elétrica, prevê-se um período de retorno de aproximadamente 6,9 anos.Com a implementação desta medida prevê-se uma redução do consumo de energia elétrica de 18236 kWh. Esta redução de consumo reflete-se no RIEE passando de 1,10 para 0,66. A classificação final altera face à classificação inicial do edifício passando de C para uma classificação de B.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

3,4
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

34,03 thousand €

Total amount of the project

Where was the money spent

By county

1 county financed .

  • Ponte de Lima 34,03 thousand € ,
Source EMRP
24.11.2026
All themes
Transparency without leading