PRR Project
Centro Social de Pedroso mais ecológico
Project sheet
Name
Centro Social de Pedroso mais ecológicoTotal project amount
91,21 thousand €Amount paid
0 €Non-refundable funding
91,21 thousand €Loan funding
0 €Start date
02.06.2026Expected end date
15.10.2026Dimension
Climate TransitionComponent
Energy efficiency in buildingsInvestment
Energy efficiency in buildings used by the service sectorOperation code
01/C13-i03/2022.P809Summary
A Operação Centro Social de Pedroso mais ecológico é um projeto do Centro Social e Paroquial de São Pedro de Pedroso que visa:- substituição da caldeira convencional existente a gasóleo, por uma nova caldeira de condensação a gasóleo (com a possibilidade de ser convertida para gás natural), que aquecerá a água quente usada para aquecimento ambiente e AQS;- substituição de parte das luminárias existentes no interior e no exterior do edifício e das luminárias exteriores, por novas luminárias com lâmpadas LED e respetivos balastros;- instalação de um sistema solar fotovoltaico, composto por 48 painéis de 540 Wp cada um, existindo 4 strings de 12 painéis em série, orientados a Sul (com um ligeiro desvio de 5 para Este) com uma inclinação de 15;- instalação de sistema solar térmico para aquecimento das águas quentes sanitárias, composto por 10 painéis (divididos em 2 baterias ligadas em paralelo, cada uma com 5 painéis ligados em série). Será instalado um dissipador de calor por convecção forçada, para a eventualidade de ser necessária a dissipação de calor no Verão.A operação propõe a alteração da certificação energética de C para B-.
Beneficiaries
The two types are::
- Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
- Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.
Call for applications
As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.
The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.
Final evaluation score
The components for calculating the assessment score can be found in the selection criteria document mentioned below.
Selection criteria
Beneficiaries
Intermediate beneficiaries
Procurement
Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.
To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.
Geographic distribution
91,21 thousand €
Total amount of the project
Where was the money spent
By county
1 county financed .
-
Vila Nova de Gaia 91,21 thousand € ,