Information portal on various topics of management of public resources of the Portuguese State

Project sheet

Name

Para Proporcionar Respostas Sociais Mais Sustentáveis

Total project amount

56,06 thousand €

Amount paid

0 €

Non-refundable funding

56,06 thousand €

Loan funding

0 €

Start date

05.05.2026

Expected end date

15.10.2026

Dimension

Climate Transition

Component

Energy efficiency in buildings

Investment

Energy efficiency in buildings used by the service sector

Operation code

01/C13-i03/2022.P652

Summary

A presente candidatura visa a implementação de medidas de eficiência energética no edifício responsável pela atividade da instituição: Misericórdia da Freguesia de Sangalhos, Instituição Particular de Solidariedade Social (IPSS). Com base nos dados relativos aos consumos energéticos vigentes na instituição, identifica-se a necessidade e oportunidade veemente de redução significativa da sua pegada carbónica e otimização dos seus consumos.Com o intuito de intervencionar 1.305,76 m2, classifica-se a Misericórdia da Freguesia de Sangalhos, destinatária das intervenções, como Grande Edifício de Comércio e Serviço (GES). A Misericórdia propõe-se a concretizar um conjunto de investimentos que otimizem o desempenho energético do edifício, passíveis de conduzir a uma redução do consumo de energia primária de 45,30 (224.731,50 kWhep/ano de energia primária, o que corresponde a uma poupança total de 23.267 /ano com gastos energéticos), redução das emissões de Gases com Efeito de Estufa em 34,06 tonCO2eq/ano (48,45) e a evolução do Indicador de Eficiência Energética (IEE) de 226,4 kWhep/(m2.ano), no cenário atual, para um IEE de 65,43 kWhep/(m2.ano), no cenário final, transgredindo de uma classificação energética D para a classe A. Assim, face ao período prévio às intervenções, demonstra-se a importância e o valor acrescentado implicado na execução do projeto. Em linha com a análise e soluções propostas em sede do Relatório de Auditoria Energética realizada ao edifício a intervencionar, as medidas a implementar serão, designadamente:1. Substituição das lâmpadas por luminárias LED;2. Instalação do sistema solar fotovoltaico;3. Instalação de bomba de calor de elevada eficiência para produção AQS;4. Instalação de bomba de calor mais eficiente para climatização.A estimativa do custo total das intervenções corresponde a 80.088,08.Posto isto, implementando todas as medidas propostas nesta candidatura, a Misericórdia da Freguesia de Sangalhos, contribui de forma inequívoca para os objetivos específicos e para as metas fixadas nos indicadores de resultado definidos na legislação de suporte.Todos os valores dispostos estão sustentados na Ferramenta Auxiliar de Cálculo do Investimento Elegível, relatório de Auditoria Energética e Certificado Energético.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

4,7
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

56,06 thousand €

Total amount of the project

Where was the money spent

By county

1 county financed .

  • Anadia 56,06 thousand € ,
Source EMRP
24.11.2026
All themes
Transparency without leading