Project sheet

Name

Ferreira Martins e Filhos - Eficiência Energética

Total project amount

55,71 thousand €

Amount paid

20,43 thousand €

Non-refundable funding

55,71 thousand €

Loan funding

0 €

Start date

26.11.2025

Expected end date

30.06.2026

Dimension

Climate Transition

Component

Energy efficiency in buildings

Investment

Energy efficiency in buildings used by the service sector

Operation code

01/C13-i03/2022.P625

Summary

A presente operação prevê a concretização da estratégia da FMF em prol da sustentabilidade ambiental, cujos objetivos visam reduzir o consumo energético da empresa e, consequentemente a sua pegada carbónica. Concretamente é intenção da FMF reduzir a sua fatura energética em 56,77 que se traduz na redução de anual do consumo de energia primária de 5,95 tep e uma redução anual estimada das emissões de CO2 emitidas em 6,92 toneladas. De forma a alcançar o objetivo proposto, pretende-se a implementação de um conjunto de medidas de melhoria, identificadas na auditoria energética realizada por um perito qualificado, que preveem não só a intervenção no edifício e melhoria de isolamento da cobertura, como também a substituição de sistemas de climatização e luminárias mais eficientes e a instalação de um sistema fotovoltaicos para Autoconsumo. Apresentam-se as seguintes Medidas de Melhoria (MM) a realizar no âmbito da operação: MM1 Substituição das lâmpadas atuais por iluminação LEDMM2 Instalação de sistema solar fotovoltaico em autoconsumo (UPAC)MM3 Instalação de uma unidade ar condicionadoMM4 Substituição da cobertura da zona dos escritóriosA concretização destas intervenções, identificadas no Certificado energético ex-ante realizado, será possível reduzir o consumo de energia primária em cerca de 56,77 e consequentemente, conduzir a uma melhoria da classe energética de classe B para classe A+.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

4,1
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

55,71 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 36,7 %,

Where was the money spent

By county

1 county financed .

  • Braga 55,71 thousand € ,
Source EMRP