PRR Project
Ferreira Martins e Filhos - Eficiência Energética
Project sheet
Name
Ferreira Martins e Filhos - Eficiência EnergéticaTotal project amount
55,71 thousand €Amount paid
20,43 thousand €Non-refundable funding
55,71 thousand €Loan funding
0 €Start date
26.11.2025Expected end date
30.06.2026Dimension
Climate TransitionComponent
Energy efficiency in buildingsInvestment
Energy efficiency in buildings used by the service sectorOperation code
01/C13-i03/2022.P625Summary
A presente operação prevê a concretização da estratégia da FMF em prol da sustentabilidade ambiental, cujos objetivos visam reduzir o consumo energético da empresa e, consequentemente a sua pegada carbónica. Concretamente é intenção da FMF reduzir a sua fatura energética em 56,77 que se traduz na redução de anual do consumo de energia primária de 5,95 tep e uma redução anual estimada das emissões de CO2 emitidas em 6,92 toneladas. De forma a alcançar o objetivo proposto, pretende-se a implementação de um conjunto de medidas de melhoria, identificadas na auditoria energética realizada por um perito qualificado, que preveem não só a intervenção no edifício e melhoria de isolamento da cobertura, como também a substituição de sistemas de climatização e luminárias mais eficientes e a instalação de um sistema fotovoltaicos para Autoconsumo. Apresentam-se as seguintes Medidas de Melhoria (MM) a realizar no âmbito da operação: MM1 Substituição das lâmpadas atuais por iluminação LEDMM2 Instalação de sistema solar fotovoltaico em autoconsumo (UPAC)MM3 Instalação de uma unidade ar condicionadoMM4 Substituição da cobertura da zona dos escritóriosA concretização destas intervenções, identificadas no Certificado energético ex-ante realizado, será possível reduzir o consumo de energia primária em cerca de 56,77 e consequentemente, conduzir a uma melhoria da classe energética de classe B para classe A+.
Beneficiaries
The two types are::
- Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
- Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.
Call for applications
As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.
The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.
Final evaluation score
The components for calculating the assessment score can be found in the selection criteria document mentioned below.
Selection criteria
Beneficiaries
Intermediate beneficiaries
Procurement
Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.
To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.
Geographic distribution
55,71 thousand €
Total amount of the project
Percentage of the amount already paid for implementing projects
, 36,7 %,Where was the money spent
By county
1 county financed .
-
Braga 55,71 thousand € ,