Information portal on various topics of management of public resources of the Portuguese State

Project sheet

Name

Aumento do Desempenho Energético do Hotel de Moura

Total project amount

200 thousand €

Amount paid

0 €

Non-refundable funding

200 thousand €

Loan funding

0 €

Start date

18.03.2026

Expected end date

15.10.2026

Dimension

Climate Transition

Component

Energy efficiency in buildings

Investment

Energy efficiency in buildings used by the service sector

Operation code

01/C13-i03/2022.P615

Summary

Esta operação tem como objectivo principal melhorar a eficiência energética do edifício Hotel de Moura, desenvolvendo sistemas de sustentabilidade com impacto positivo no ambiente que permitam atingir uma redução do consumo da energia primária em pelo menos 30, bem como das emissões de CO2. As acções preconizadas na auditoria energética e enquadráveis nas tipologias do ponto 6 do aviso n. 01/C13-i03/2022 são as seguintes:- Substituição das janelas actuais, em madeira, nalguns casos já bastante degradada, com vidro simples de 4 mm de espessura, por janelas novas, também em madeira (uma vez que se trata de um edifício histórico, ter-se-á de manter todos os materiais e formas originais), mas com classificação máxima de permeabilidade ao ar e de eficiência energética - Classe A+ - e com vidro duplo;- Substituição de equipamentos de climatização (AVAC) antigos, com eficiências muito reduzidas, que ainda recorrem ao gás refrigerante R22, por novos equipamentos, energeticamente mais eficientes e que recorrem ao gás R32 (mais amigo do ambiente);- Instalação de sistema solar fotovoltaico (UPAC), com 32 kWp de potência, para produção de energia eléctrica para autoconsumo, através de uma fonte de energia renovável (energia solar). Este sistema cobrirá 34 das necessidades atuais de energia eléctrica do edifício;- Substituição da caldeira a gás, já bastante antiga, dispondo de uma eficiência reduzida. Esta caldeira fornece o edifício de água quente sanitária, sendo o único equipamento responsável pela utilização do gás propano neste edifício. Considerou-se assim, nesta medida, a sua substituição por caldeira de condensação, com eficiência superior a 100;- Auditoria energética e emissão de Certificado Energético ex-ante e ex-post, no âmbito do SCE, para assegurar que as intervenções acima representam uma redução do consumo de energia primária do Hotel em, pelo menos, 30.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

3,3
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

200 thousand €

Total amount of the project

Where was the money spent

By county

1 county financed .

  • Moura 200 thousand € ,
Source EMRP
24.11.2026
All themes
Transparency without leading