PRR Project

Éden mais verde e eficiente - melhoria do desempenho energético e ambiental Hotel Quinta do Éden

Project sheet

Name

Éden mais verde e eficiente - melhoria do desempenho energético e ambiental Hotel Quinta do Éden

Total project amount

78,07 thousand €

Amount paid

23,42 thousand €

Non-refundable funding

78,07 thousand €

Loan funding

0 €

Start date

13.01.2026

Expected end date

30.06.2026

Dimension

Climate Transition

Component

Energy efficiency in buildings

Investment

Energy efficiency in buildings used by the service sector

Operation code

01/C13-i03/2022.P517

Summary

Este projeto foi definido por forma a focar o investimento em medidas de investimento que permitam a atingir o maior potencial a eficiência energética do edifício diminuição de 38,67 dos consumos de energia primária, com a melhor racionalidade económica.Este é um projeto de investimento direcionado e integrado que permite resultados exponenciais em termos de poupança pela incorporação de linhas de investimento em equipamentos complementares entre si. A aposta decorre das melhorias identificadas no CE (certificado Energético) e centram-se em 5 linhas de investimento: investimentos em sistemas de ventilação VRV, Sistema solar fotovoltaico para autoconsumo, bombas de calor, sistema solar térmico para AQS e auditorias e certificados energéticos.Em termos de objetivos do projeto que estão diretamente enquadrados no investimento a realizar, em linha com o descrito no aviso este centram-se:Objetivos gerais:1.Fomentar a eficiência energética do edifício onde a empresa Hotel Miravagos, Lda desenvolve atividade de serviços de hotelaria e restauração, contribuindo para a melhoria do seu desempenho energético 2.Apostar num mix integrado de medidas de melhoria do desempenho energético do edifício e alargar as soluções de produção de energia de fontes renováveis em regime de autoconsumo no edifício, diminuído a dependência diminuindo a emissão de gases de efeito estufa3.Contribuir para a diminuição dos consumos de energia fóssil em edifícios de serviços, e muito em concreto para o objetivo de se alcançar a neutralidade carbónica em 2050 (RNC 2050), no âmbito da ELPRE e em linha com os pressupostos do Regulamento (UE) 2021/241 do Parlamento Europeu e do Conselho de 12 de fevereiro de 2021. 4.Redução da fatura e da dependência energética da empresa e por consequência do país, bem como a redução de emissões de gases com efeito de estufa (GEE)Objetivos Específicos:1.Reduzir o consumo de energia primária no edifício a intervencionar em 38,67, face ao período de referência 2.Reduzir a emissão de gases de efeito estufa em 26.3 toneladas equivalentes de CO2 e diminuição anual do consumo de energia primária (tep/ano) de 13.893.Investir na adoção de equipamentos de produção de energia renovável para autoconsumo e sistemas de ventilação - AVAC, bomba de calor e sistemas solar térmicos para AQS, enquadrados nas tipologias do aviso, capazes de potenciar a eficiência e conforto energético do edifício

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

3,8
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

78,07 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 30 %,

Where was the money spent

By county

1 county financed .

  • Vagos 78,07 thousand € ,
Source EMRP