Adega do Pisão - Restaurante SustentávelTotal project amount
9,75 thousand €Amount paid
9,75 thousand €Non-refundable funding
9,75 thousand €Loan funding
0 €Start date
05.11.2022Expected end date
21.10.2025Dimension
Climate TransitionComponent
Energy efficiency in buildingsInvestment
Energy efficiency in buildings used by the service sectorOperation code
01/C13-i03/2022.P496Summary
A operação em causa, envolve dois investimentos perfeitamente integrados nas seguintes Tipologias:3.1 - Instalação de sistemas de produção de energia elétrica para autoconsumo, através de fontes renováveis com e sem armazenamento de energia 12.978 eur + IVA 5.1. Auditorias energéticas e a emissão de Certificado Energético ex-ante e ex-post, no âmbito do SCE 950 eur + IVAQue representam um investimento total de 13.928 eur + IVA.Estes investimentos serão realizados num Pequeno Edifício de Serviços sem Climatização (PESsC), onde a empresa desenvolve a atividade principal é Restaurantes. Este edifício está arrendado á Empresa.Os investimentos em causa estão previstos e enquadram-se perfeitamente nas tipologias de intervenção e respetivas sub-tipologias previstas no Ponto 6 do Aviso em causa, e serão desenvolvidas num edifício contemplados no Certificado Energético, n. SCE277258940, válido até 11/05/2032, que se anexa ao processo de Candidatura.Este Sistema de Central Fotovoltaica e Autoconsumo, sem baterias, instalado na cobertura, composto por 29 módulos fotovoltaicos AEG AS-M1443, perfazendo uma área total 63 m; com uma potência nominal de 13,0 kW e a tensão nominal 41 V, produzirá, desta forma, energia elétrica estimada em 20 550 kWh/ano, o que, de acordo com o Relatório de Auditoria, permitirá obter poupanças anuais de 1 750 face a um investimento de 12 978.Permitirá ainda uma redução de 84,27 de redução de consumo de energia primária.
Beneficiaries
The two types are::
- Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
- Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.
Call for applications
As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.
The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.
Final evaluation score
The components for calculating the assessment score can be found in the selection criteria document mentioned below.
Selection criteria
Beneficiaries
Intermediate beneficiaries
Procurement
Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.
To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.
Geographic distribution
9,75 thousand €
Total amount of the project
Percentage of the amount already paid for implementing projects
, 100 %,Where was the money spent
By county
1 county financed .
-