Project sheet

Name

Eficiência Energética no Edifício da Sociedade Figueira Praia SA

Total project amount

200 thousand €

Amount paid

0 €

Non-refundable funding

200 thousand €

Loan funding

0 €

Start date

01.02.2022

Expected end date

25.06.2026

Dimension

Climate Transition

Component

Energy efficiency in buildings

Investment

Energy efficiency in buildings used by the service sector

Operation code

01/C13-i03/2022.P414

Summary

Pretende-se com o projeto Eficiência Energética no Edifício da Sociedade Figueira Praia SA concretizar um conjunto de medidas que contribuem para os seguintes eixos de intervenção:- Aumento da a eficiência energética em Edifício de Serviços, através da implementação de medidas integradas de promoção da eficiência energética e da racionalização dos consumos - Aumento da utilização das energias renováveis Edifício de Serviços;Deste modo a operação encontra-se perfeitamente alinhada com os objetivos do Plano de Recuperação e Resiliência assim como com os objetivos do Plano Nacional Energia e Clima 2030 (PNEC 2030).As medidas constantes da operação que visam o aumento da eficiência energética no Edifício da Sociedade Figueira Praia SA inclui as seguintes tipologias de intervenção:ii) Intervenção em sistemas técnicos (tipologia 2) MM1 - Instalação de sistema de gestão de energia (GT/GTC) (subtipologia 2.7); MM2 - Susbtituição das lâmpadas atuais e/ou instalação de LED´s para iluminação (subtipologia 2.5); MM3 - Instalação de sistema de recuperação de calor nas UTA´s e/ou UTAN´s para aquecimento ambiente (subtipologia 2.3);iii) Produção de energia com base em fontes de energia renováveis (FER) para autoconsumo (tipologia 3): MM4 - Instalação de sistema solar fotovoltaico ligado à rede de baixa tensão (subtipologia 3.1).v) Ações imateriais Auditorias energéticas e a emissão de Certificado Energético ex-ante , no âmbito do SCE (tipologia 5.1); Auditorias energéticas e a emissão de Certificado Energético ex-post, no âmbito do SCE (tipologia 5.1);Com a implementação da operação pretende-se atingir os seguintes objetivos: Redução de Energia Primária (tep/ano): 163,50 tep/ano Redução do consumo de energia primária: 38,75 Redução das emissões (tonCO2/ano): 191,91 tonCO2/ano

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

3,0
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

200 thousand €

Total amount of the project

Where was the money spent

By county

1 county financed .

  • Figueira da Foz 200 thousand € ,
Source EMRP