Information portal on various topics of management of public resources of the Portuguese State

Project sheet

Name

Eficiência Energética em edifício de serviço - FCO, Unipessoal, Lda

Total project amount

62,18 thousand €

Amount paid

62,17 thousand €

Non-refundable funding

62,18 thousand €

Loan funding

0 €

Start date

01.05.2022

Expected end date

06.05.2026

Dimension

Climate Transition

Component

Energy efficiency in buildings

Investment

Energy efficiency in buildings used by the service sector

Operation code

01/C13-i03/2022.P360

Summary

A FCO, Unipessoal, Lda tem o objetivo de tornar o seu edifício energeticamente mais eficiente, permitindo assim a melhoria dos níveis de conforto para os clientes como também para os seus funcionários, a melhoria da qualidade do ar interior, a promoção da produtividade laboral, a extensão da vida útil do edifício, a redução da fatura e da dependência energética do país, bem como a redução de emissões de gases com efeito de estufa.A operação integra as seguintes tipologias/subtipologias de intervenção:- Subtipologia 1.1: Substituição de vãos envidraçados (janelas e portas) por mais eficientes- Subtipologia 1.3: Aplicação ou substituição de isolamento térmico em coberturas, paredes ou pavimentos, bem como a substituição de portas de entrada- Subtipologia 2.3: Instalação ou substituição de sistemas AVAC e/ou AQ- Subtipologia 2.5: Ações em sistemas de iluminação interior e exterior, considerando apenas a substituição integral das luminárias- Subtipologia 3.1: Instalação de sistemas de produção de energia elétrica para autoconsumo, através de fontes renováveis com e sem armazenamento de energia- Subtipologia 5.1: Auditoria energética e a emissão de Certificado Energético ex-ante e ex-post, no âmbito SCECom estas intervenções propostas pelo perito qualificado, no certificado energético, a FCO irá conseguir uma redução do consumo de energia primária do seu edifício em 73,80 e consequentemente aumentar a classificação energética do edifício, no qual se espera que, no cenário final, a classe energética seja A+.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

3,6
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

62,18 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 100 %,

Where was the money spent

By county

1 county financed .

  • Cabeceiras de Basto 62,18 thousand € ,
Source EMRP
24.11.2026
All themes
Transparency without leading