Information portal on various topics of management of public resources of the Portuguese State

PRR Project

Implementação de Medidas de Melhoria com o objetivo de redução superior a 80% na energia primária

Project sheet

Name

Implementação de Medidas de Melhoria com o objetivo de redução superior a 80% na energia primária

Total project amount

61,22 thousand €

Amount paid

50 thousand €

Non-refundable funding

61,22 thousand €

Loan funding

0 €

Start date

01.06.2022

Expected end date

31.03.2023

Dimension

Climate Transition

Component

Energy efficiency in buildings

Investment

Energy efficiency in buildings used by the service sector

Operation code

01/C13-i03/2022.P358

Summary

A implementação do presente projeto de investimento visa contribuir para a melhoria do desempenho energético, ambiental e eficiência energética do edifício sito na Rua Humberto Batista Martins, Zona Industrial de Santarém, lote 16 A, em Santarém, onde a empresa desenvolve a sua atividade.Com este projeto de investimento a empresa Paulus Cópia, contribui para o objetivo geral de promoção da coesão económica, social e territorial da União, através da melhoria da resiliência, da preparação para situações de crises, da capacidade de ajustamento e do potencial de crescimento dos Estados-Membros, através do apoio à transição ecológica, através do contributo para atingir as metas da União para 2030 em matéria de clima previstas no artigo 2.o , ponto 11, do Regulamento (UE) 2018/1999 do Parlamento Europeu e do Conselho, e através do cumprimento do objetivo da neutralidade climática da UE até 2050 assim restaurando e promovendo o crescimento sustentável.Neste projeto pretende-se implementar quatro (4) medidas de melhoria identificadas em sede de auditoria energética, nomeadamente a MURE1 - Instalação de sistemas de produção de energia elétrica para autoconsumo, através de fontes renováveis com e sem armazenamento de energia; MURE2 - Instalação ou substituição de sistemas de AVAC ; MURE3 - Ações em sistemas de iluminação interior e exterior, considerando apenas a substituição integral das luminárias e MURE4 - Substituição de vãos envidraçados (janelas e portas) por mais eficientes.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

4,0
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

61,22 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 81,7 %,

Where was the money spent

By county

1 county financed .

  • Santarém 61,22 thousand € ,
Source EMRP
24.11.2026
All themes
Transparency without leading