Project sheet

Name

Melhoria da Eficiência Energética do Edifício Sede

Total project amount

136,55 thousand €

Amount paid

40,96 thousand €

Non-refundable funding

136,55 thousand €

Loan funding

0 €

Start date

01.04.2022

Expected end date

31.12.2025

Dimension

Climate Transition

Component

Energy efficiency in buildings

Investment

Energy efficiency in buildings used by the service sector

Operation code

01/C13-i03/2022.P321

Summary

A operação consiste na implementação de medidas que fomentam a eficiência energética, bem como iniciar a produção de energia de fontes renováveis em regime de autoconsumo, contribuindo para a melhoria do desempenho energético e ambiental do seu Edifício Sede, objeto desta candidatura.Com estas medidas pretende-se reabilitar e tornar o edifício energeticamente mais eficiente potenciando a melhoria dos níveis de conforto térmico; qualidade do ar interior e ruído -beneficiando a saúde dos colaboradores que exercem a sua atividade neste espaço bem como a sua produtividade. Simultaneamente, potenciar a sua vida útil e reduzir a fatura energética da empresa, contribuindo para o decréscimo da dependência energética do país. Contribui assim para as metas definidas no Plano Nacional Energia e Clima 2021-2030 (PNEC2030), na Estratégia de Longo Prazo para a Renovação dos Edifícios (ELPRE) com o objetivo de alcançar a neutralidade carbónica em 2050 (RNC 2050), bem como para outros objetivos ambientais. Objetivos:- Melhoria da envolvente envidraçada.- Melhoria do isolamento nas envolventes opacas (paredes e cobertura) com o exterior.- Melhoria da eficiência do sistema de AVAC: Substituição do sistema atualmente existente composto por vários sistemas individuais do tipo split, por um novo sistema de AVAC, centralizado, incluindo sistema de renovação de ar (unidade de ventilação) e com recuperador de calor.- Melhoria da eficiência do sistema de iluminação, com substituição dos equipamentos para outros de menor consumo, melhor controlo e manutenção.- Redução do consumo energético com produção de energia para autoconsumo.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

4,0
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

136,55 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 30 %,

Where was the money spent

By county

1 county financed .

  • Maia 136,55 thousand € ,