PRR Project
Gosimat 2022 - Melhoria de desempenho energético de edificio
Project sheet
Name
Gosimat 2022 - Melhoria de desempenho energético de edificioTotal project amount
35,93 thousand €Amount paid
35,93 thousand €Non-refundable funding
35,93 thousand €Loan funding
0 €Start date
01.12.2022Expected end date
15.01.2026Dimension
Climate TransitionComponent
Energy efficiency in buildingsInvestment
Energy efficiency in buildings used by the service sectorOperation code
01/C13-i03/2022.P245Summary
A Gosimat tem a intenção de dotar o edifício-sede com um sistema de produção local de energia elétrica para autoconsumo com fonte de energia renovável (solar), intervenção esta que respeita as tipologias previstas no referido Aviso e que visa a prossecução dos objetivos previstos no Regulamento (EU) 2021/241. Nomeadamente, a intervenção proposta irá introduzir sistemas e tecnologias que possibilitam uma redução significativa dos consumos, em particular energéticos de origem fóssil e contribuir para a redução das emissões de gases com efeito de estufa.Foram também contratados serviços de elaboração de auditoria energética e de certificação energética, assim como estudos de viabilidade técnico-económica de medidas de eficiência energética por forma a avaliar o seu impacto no desempenho energético global do edifício alvo desta candidatura.A operação integra assim duas subtipologias de intervenção que se inserem ao nível de: (3) sistemas de produção local de energia elétrica para autoconsumo com fonte de energia renovável (solar) e (5) as ações imateriais. Perante as condições e disposições apresentadas no certificado energético, ref. SCE0000277290431, desenvolvido ao abrigo das condições de elegibilidade dos investimentos preconizados no Aviso n. 01/C13 i03/2022, é possível verificar que este edifício representa um encargo anual com custos de energia 10 578 euros. Em termos energéticos este valor traduz-se num consumo anual global de energia final na ordem de 59 393 kWh/ano (obtido em condições nominais pelo SCE).A medida de intervenção aplicada neste edifício permite melhorar a classe energética de D para A, o que representa um acréscimo de quatro níveis no desempenho energético garantindo uma redução de cerca de aproximadamente 57 no consumo de energia primária (tep/ano) de origem fóssil.
Beneficiaries
The two types are::
- Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
- Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.
Call for applications
As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.
The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.
Final evaluation score
The components for calculating the assessment score can be found in the selection criteria document mentioned below.
Selection criteria
Beneficiaries
Intermediate beneficiaries
Procurement
Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.
To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.
Geographic distribution
35,93 thousand €
Total amount of the project
Percentage of the amount already paid for implementing projects
, 100 %,Where was the money spent
By county
1 county financed .
-
Leiria 35,93 thousand € ,