Information portal on various topics of management of public resources of the Portuguese State

Project sheet

Name

Gosimat 2022 - Melhoria de desempenho energético de edificio

Total project amount

35,93 thousand €

Amount paid

35,93 thousand €

Non-refundable funding

35,93 thousand €

Loan funding

0 €

Start date

01.12.2022

Expected end date

15.01.2026

Dimension

Climate Transition

Component

Energy efficiency in buildings

Investment

Energy efficiency in buildings used by the service sector

Operation code

01/C13-i03/2022.P245

Summary

A Gosimat tem a intenção de dotar o edifício-sede com um sistema de produção local de energia elétrica para autoconsumo com fonte de energia renovável (solar), intervenção esta que respeita as tipologias previstas no referido Aviso e que visa a prossecução dos objetivos previstos no Regulamento (EU) 2021/241. Nomeadamente, a intervenção proposta irá introduzir sistemas e tecnologias que possibilitam uma redução significativa dos consumos, em particular energéticos de origem fóssil e contribuir para a redução das emissões de gases com efeito de estufa.Foram também contratados serviços de elaboração de auditoria energética e de certificação energética, assim como estudos de viabilidade técnico-económica de medidas de eficiência energética por forma a avaliar o seu impacto no desempenho energético global do edifício alvo desta candidatura.A operação integra assim duas subtipologias de intervenção que se inserem ao nível de: (3) sistemas de produção local de energia elétrica para autoconsumo com fonte de energia renovável (solar) e (5) as ações imateriais. Perante as condições e disposições apresentadas no certificado energético, ref. SCE0000277290431, desenvolvido ao abrigo das condições de elegibilidade dos investimentos preconizados no Aviso n. 01/C13 i03/2022, é possível verificar que este edifício representa um encargo anual com custos de energia 10 578 euros. Em termos energéticos este valor traduz-se num consumo anual global de energia final na ordem de 59 393 kWh/ano (obtido em condições nominais pelo SCE).A medida de intervenção aplicada neste edifício permite melhorar a classe energética de D para A, o que representa um acréscimo de quatro níveis no desempenho energético garantindo uma redução de cerca de aproximadamente 57 no consumo de energia primária (tep/ano) de origem fóssil.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

4,0
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

35,93 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 100 %,

Where was the money spent

By county

1 county financed .

  • Leiria 35,93 thousand € ,
Source EMRP
24.11.2026
All themes