Information portal on various topics of management of public resources of the Portuguese State

Project sheet

Name

Candidatura da loja Cash & Carry de Albujeira

Total project amount

20,61 thousand €

Amount paid

20,61 thousand €

Non-refundable funding

20,61 thousand €

Loan funding

0 €

Start date

01.05.2022

Expected end date

23.12.2025

Dimension

Climate Transition

Component

Energy efficiency in buildings

Investment

Energy efficiency in buildings used by the service sector

Operation code

01/C13-i03/2022.P242

Summary

A candidatura apresentada pela GARCIAS, S.A. ao programa Eficiência energética em edifícios de serviços, no âmbito do investimento TC-C13-i03 Eficiência energética em edifícios de serviços da Componente C13 Eficiência Energética em Edifícios do Plano de Recuperação e Resiliência tem como objetivo melhorar o desempenho energético do seu edifício em Albufeira, de modo a reforçar a sua sustentabilidade económica e ambiental.O edifício alvo de intervenção, funciona desde 2014, como supermercado cash carry e localiza-se no Vale do Paraíso, em Albufeira, onde funcionam os serviços relacionados com a atividade comercial, administrativa e logística inerentes ao funcionamento daquele supermercado.De acordo com os resultados apresentados na auditoria energética foi identificado como medida de melhoria a instalação de um sistema fotovoltaico para auto consumo, pelo que, foi decidido apresentar candidatura às seguintes tipologias de intervenção:Tipologia 3- Intervenção ao nível da produção de energia, com base em fontes de energia renováveis para auto consumo, com a instalação de um sistema de painéis fotovoltaicos.Tipologia 5 - Ações imateriais, onde se inclui a elaboração da auditoria energética, a emissão dos Certificados Energéticos (ex ante e ex-poste) e o trabalho de consultoria de preparação e execução dos procedimentos concursais.Face aos resultados apresentados, concluiu-se que a medida de melhoria proposta cumpre com o objetivo principal do programa de redução do consumo de energia primária, permitindo que, após a conclusão da intervenção, o edifício alvo de intervenção melhore o seu desempenho energético, alcançado-se uma redução de consumo de energia primária de 43,1,ou seja, de 104.340 kWhep, o que supera o mínimo de 30 estabelecido no respetivo Aviso de candidatura.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

4,4
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

20,61 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 100 %,

Where was the money spent

By county

1 county financed .

  • Albufeira 20,61 thousand € ,
Source EMRP
24.11.2026
All themes