Project sheet

Name

Eficiência Energética: Estalagem de Santa Iria

Total project amount

200 thousand €

Amount paid

199,48 thousand €

Non-refundable funding

200 thousand €

Loan funding

0 €

Start date

01.06.2022

Expected end date

22.06.2026

Dimension

Climate Transition

Component

Energy efficiency in buildings

Investment

Energy efficiency in buildings used by the service sector

Operation code

01/C13-i03/2022.P156

Summary

A presente intervenção visa dotar o edifício de equipamentos e soluções energéticas com grande eficiência, de modo a contribuir para melhorar o desempenho energético do edifício e reduzir custos. Para tal, estão contemplados investimentos nas seguintes tipologias de intervenção: Tipologia de intervenção 1 Envolvente opaca e envidraçada que visa a substituição das caixilharias e vidros existentes, bem como o isolamento da cobertura; Tipologia de intervenção 2 Intervenção em sistemas técnicos que visa a substituição dos sistemas de iluminação convencionais por sistemas de iluminação de tecnologia led;Tipologia de intervenção 3 - Produção de energia com base em fontes de energia renováveis (FER) para autoconsumo que visa a instalação de sistema solar fotovoltaico de autoconsumo, bomba de calor para climatização e bomba de calor para AQS;Tipologia de intervenção 5 Ações Imateriais que visa a elaboração da Auditoria Energética e emissão de Certificado Energético, ex-ante e ex-post, bem como as respetivas taxas às entidades oficias. Os objetivos do presente projeto classificam-se em duas componentes, qualitativos e quantitativos. Qualitativos: 1- Aumento do conforto térmico para os hóspedes e visitantes;2- Aumento da qualidade do ar nas instalações do empreendimento;3- Aumento da durabilidade das infraestruturas. Quantitativos1- Redução no consumo de energia primária em 68,67;2 - Redução na fatura energética anual em 19.287,00 ; 3 Diminuição de 36,71 toneladas de CO2 emitidos. Nota: Refere-se que relativamente a Licença de Utilização do Imóvel esta não é aplicável ao edifício em questão, uma vez que este é propriedade municipal e encontra-se a data de hoje em requalificação, tal como demonstrado pela Certidão emitido pela Câmara Municipal de Tomar a 25 de março do presente ano que se encontra junto do Anexo V.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

4,2
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

200 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 99,7 %,

Where was the money spent

By county

1 county financed .

  • Tomar 200 thousand € ,
Source EMRP
24.11.2026