Information portal on various topics of management of public resources of the Portuguese State

Project sheet

Name

Tejo Ambiente - Promoção do desempenho energético e ambiental do edifício de serviços

Total project amount

15,87 thousand €

Amount paid

0 €

Non-refundable funding

15,87 thousand €

Loan funding

0 €

Start date

11.05.2026

Expected end date

15.10.2026

Dimension

Climate Transition

Component

Energy efficiency in buildings

Investment

Energy efficiency in buildings used by the service sector

Operation code

01/C13-i03/2022.P1456

Summary

A Tejo Ambiente, EIM, S.A. é uma empresa intermunicipal de direito privado, constituída da vontade de seis Municípios integrarem os respetivos sistemas municipais de abastecimento público de água, de saneamento de águas residuais urbanas e de gestão de resíduos urbanos, por forma a que os mesmos fossem explorados conjuntamente.Tem por missão a gestão integrada e partilhada dos Sistemas de Abastecimento de gua, de Saneamento de guas Residuais e de Resíduos Urbanos dos Municípios de Ferreira de Zêzere, Mação, Ourém, Sardoal, Tomar e Vila Nova de Barquinha, para um universo de cerca de 106 mil habitantes e 77 mil alojamentos, de forma mais eficiente e ambientalmente sustentada.As infraestruturas alvo de intervenção no presente projeto situam-se em Ourém e são da tipologia principal escritório, centralizando-se neste edifício o apoio administrativo e técnico, bem como o atendimento ao público nos serviços que prestamos à população. Trata-se de uma fração com área total de 349.80 m2 despromovida de elementos que proporcionam a sua eficiência energética, conforme atesta a auditoria energética efetuada ao edifício. Vemos neste projeto reunidas as condições de apoio para a adoção de medidas que fomentam a eficiência energética do edifício, nomeadamente, a aquisição de painéis fotovoltaicos em regime de autoconsumo, melhorando o desempenho energético e ambiental do edifício de serviços.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

4,1
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

15,87 thousand €

Total amount of the project

Where was the money spent

By county

1 county financed .

  • Ourém 15,87 thousand € ,
Source EMRP
24.11.2026
All themes
Transparency without leading