Information portal on various topics of management of public resources of the Portuguese State

Project sheet

Name

Reabilitação Energética do Edifício de Serviços Tecauto - Torres Vedras

Total project amount

185,69 thousand €

Amount paid

77,1 thousand €

Non-refundable funding

185,69 thousand €

Loan funding

0 €

Start date

22.01.2026

Expected end date

30.06.2026

Dimension

Climate Transition

Component

Energy efficiency in buildings

Investment

Energy efficiency in buildings used by the service sector

Operation code

01/C13-i03/2022.P1429

Summary

A entidade beneficiária do projeto é a Tecauto - Técnica e Comércio de Automóveis, S.A com o NIF 500279861. O edifício situa-se na Avenida Carlos Lopes, n. 23, em Torres Vedras. O edifício, constituído por 3 pisos destinado a comércio e representação de veículos automóveis de qualquer espécie ou natureza, seus acessórios e produtos afins e indústria de reparação dos mesmos.Por se tratar de um Edifício de Serviços com uma área total superior a 1000 m2, nos termos da alínea w) do artigo 3. do Decreto-Lei 101-d/2020, na sua redação atual, e que exerce atividade comercial nesse edifício nos termos do disposto no artigo 4. da Lei n. 30/2013, de 8 de maio de 2013, considera-se beneficiário do Aviso Investimento TC-C13-i03 Eficiência Energética em edifícios de serviços N. 01/C13-i03/2022.No cenário atual, antes da implementação das medidas de melhoria, o edifício apresenta consumos previstos de 196 241,0 kWh/ano em eletricidade e 56 468,0 kWh/ano em gasóleo baseados no ano de referência de 2019. A estes valores correspondem consumos anuais previstos de 47,31 tep/ano, e emissões anuais previstas de 65,02 tonCO2eq/ano.Com a implementação das medidas de melhoria, o edifício passará a consumir 3,04 tep/ano e a emitir 7,7tonCO2eq/ano.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

4,7
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

185,69 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 41,5 %,

Where was the money spent

By county

1 county financed .

  • Torres Vedras 185,69 thousand € ,
Source EMRP
24.11.2026
All themes
Transparency without leading