Information portal on various topics of management of public resources of the Portuguese State

Project sheet

Name

PRR Fundo Ambiental - Eficiência Energética Bloco Frio

Total project amount

69,87 thousand €

Amount paid

0 €

Non-refundable funding

69,87 thousand €

Loan funding

0 €

Start date

08.05.2026

Expected end date

15.10.2026

Dimension

Climate Transition

Component

Energy efficiency in buildings

Investment

Energy efficiency in buildings used by the service sector

Operation code

01/C13-i03/2022.P1385

Summary

A presente operação compreende um conjunto de medidas de racionalização energética com o intuito da Eficiência Energética e de Utilização Racional de Energia com vista à redução dos consumos energéticos, respetivos custos e, também, aumentar o desempenho energético das instalações.Com o objetivo de reduzir os consumos de energéticos do edifício em estudo, são propostas medidas de melhoria que incidem sobre os equipamentos e sobre o edifício. Para tal selecionaram-se as seguintes medidas de melhoria as quais se inserem nas seguintes tipologias de intervenção, de acordo com o ponto 6 do aviso:1.Produção de energia com base em fontes de energia renováveis (FER) para autoconsumo 1.1.Instalação de um sistema fotovoltaico destinado ao autoconsumo com uma capacidade total de produção de energia de 127.969 kWh/ano. O parque solar, será instalado na cobertura exterior do edifício. Serão instalados 196 módulos fotovoltaicos de 455 Wp cada, totalizando uma potência de 88,2 kWp e uma área de implantação de 436,7 m2.2.Ações Imateriais 2.1.Auditorias energéticas e a emissão de Certificado Energético ex-ante e ex-post, de forma a comprovar a eficácia das medidas implementadas.A operação teve início em julho de 2022 com a realização da auditoria energética e respetiva certificação de forma a definir o cenário ex-ante, sendo que a realização dos investimentos irá ter início em outubro de 2022, prevendo-se a conclusão da operação em julho de 2023 com a realização da Auditoria Energética Ex-Post.Com a implementação das medidas de melhoria propostas o edifício passará de uma classificação energética (B-) para uma classificação energética (A) o que corresponde à melhoria do desempenho energético em duas classes energéticas. , ainda de mencionar que com estas medidas irá ser possível a redução do consumo de energia primaria em 53,25.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

4,3
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

69,87 thousand €

Total amount of the project

Where was the money spent

By county

1 county financed .

  • Paredes 69,87 thousand € ,
Source EMRP
24.11.2026
All themes
Transparency without leading