PRR Project
EDEN Resort eficiente e sustentável
Project sheet
Name
EDEN Resort eficiente e sustentávelTotal project amount
173,82 thousand €Amount paid
127,83 thousand €Non-refundable funding
173,82 thousand €Loan funding
0 €Start date
06.10.2022Expected end date
30.06.2023Dimension
Climate TransitionComponent
Energy efficiency in buildingsInvestment
Energy efficiency in buildings used by the service sectorOperation code
01/C13-i03/2022.P132Summary
A operação tem por objectivo tornar o EDEN Resort um exemplo de Eficiência Energética tornando-o um Edifício de Energia Quase Zero, fazendo a atualização dos sistemas técnicos de climatização e aquecimento de guas Sanitárias.O atual sistema é composto por chillers só frio e caldeiras a gás propano que fazem o aquecimento e aguas quentes sanitárias, com distribuição por sistema de 4 tubos a partir duma central térmica para todas as 198 unidades de alojamento numa area de cerca de 10ha, sem equilíbrio hidráulico. Será substituído por um chiller 4 tubos Inverter integrado de alta eficiência, com produção simultânea de agua gelada a 7/12C e a agua quente até 40/45C. O calor a 40/45C será usado para a Bomba de Calor Agua/Agua Booster que fará a elevação de temperatura até 65/70C com elevada eficiência COP5, produzindo a agua quente sanitária quase gratuita no Verão e muito barata no Inverno. Em cada unidade de alojamento serão aplicadas 2 válvulas de regulação dinâmica de caudal PICV, para equilíbrio hidráulico dos circuitos fechados dos Ventiloconvectores e do Permutador de Placas para a produção local de AQS. Será instalada uma nova Gestão Técnica Centralizada para controlo e monitorização de todo o sistema, em conjunto com alterações do esquema hidráulico e variação de velocidade dos circuladores. O enorme aumento de eficiência do sistema implica deixar de usar combustíveis fosseis para todos os aquecimentos e produzir todos os aquecimentos com eletricidade de forma muito mais eficiente.Em complemento será instalado um sistema FotoVoltaico para produção elétrica em Autoconsumo e a troca do chuveiros existentes por outros eficientes.
Beneficiaries
The two types are::
- Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
- Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.
Call for applications
As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.
The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.
Final evaluation score
The components for calculating the assessment score can be found in the selection criteria document mentioned below.
Selection criteria
Beneficiaries
Intermediate beneficiaries
Procurement
Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.
To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.
Geographic distribution
173,82 thousand €
Total amount of the project
Percentage of the amount already paid for implementing projects
, 73,5 %,Where was the money spent
By county
1 county financed .
-
Albufeira 173,82 thousand € ,