CENTRO DE ATIVIDADES E CAPACITAÇÃO PARA A INCLUSÃOTotal project amount
124,74 thousand €Amount paid
87,32 thousand €Non-refundable funding
124,74 thousand €Loan funding
0 €Start date
08.06.2026Expected end date
31.07.2026Dimension
ResilienceComponent
Social InterventionInvestment
New Generation of Equipment and Social InterventionOperation code
19/C03-i01/2026.PPRR-RE-C03-i01-19-000026Summary
A ASSOL Associação de Solidariedade Social de Lafões tem no Centro de S. Pedro um CACI que foi alvo de intervenção no âmbito de um PRR (Investimento RE-C03-I01 - Nova Geração de equipamentos e Respostas Sociais, N.º 15/C03-i01/2025, RE-C03-i01.m01 – Requalificação e alargamento da rede de equipamentos e respostas sociais). A obra está a decorrer, e embora o seu grau de maturidade não seja o que gostaríamos, a obra decorre a bom ritmo e será concluída no período previsto. Esta atual candidatura (N.º 19/C03-i01/2026) vai permitir apetrechar este espaço condignamente, com material que seguramente contribui para melhorar a qualidade de vida e a qualidade dos apoios, sendo duplamente importante: para as pessoas que apoiamos nesta resposta e para os colaboradores que diariamente ali exercem as suas funções. Não obstante do grau de dificuldade das pessoas, a ASSOL usa há muitos anos o Planeamento Centrado na Pessoa, como metodologia de trabalho no CACI e isto dá oportunidade às pessoas de fazerem as suas escolhas, de decidirem as atividades em que querem participar, de frequentarem várias atividades com muita flexibilidade, incluindo no exterior. É também muito interessante verificar que as nossas pessoas apoiadas gostam muito de estar atualizadas ao nível das tecnologias, por isso o PC é uma coisa com que lidam em muitas circunstâncias, dentro das suas capacidades. Para as pessoas com limitações muito severas, é ainda solicitado algum material para apetrechamento de um espaço para maior conforto.O Objetivo geral da ASSOL ao candidatar-se neste aviso é pois, apetrechar o nosso CACI devidamente, por forma a garantir a melhor qualidade de vida, com as melhores tecnologias e equipamentos moveis para que as Pessoas apoiadas e colaboradores gostem de estar na ASSOL e se sintam felizes e satisfeitos.
Beneficiaries
The two types are::
- Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
- Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.
Call for applications
As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.
The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.
Final evaluation score
The components for calculating the assessment score can be found in the selection criteria document mentioned below.
Selection criteria
Beneficiaries
Intermediate beneficiaries
Procurement
Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.
To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.
Geographic distribution
124,74 thousand €
Total amount of the project
Percentage of the amount already paid for implementing projects
, 70 %,Where was the money spent
By county
1 county financed .
-
São Pedro do Sul 124,74 thousand € ,