Name

CENTRO DE ATIVIDADES E CAPACITAÇÃO PARA A INCLUSÃO

Total project amount

124,74 thousand €

Amount paid

87,32 thousand €

Non-refundable funding

124,74 thousand €

Loan funding

0 €

Start date

08.06.2026

Expected end date

31.07.2026

Dimension

Resilience

Component

Social Intervention

Investment

New Generation of Equipment and Social Intervention

Operation code

19/C03-i01/2026.PPRR-RE-C03-i01-19-000026

Summary

A ASSOL Associação de Solidariedade Social de Lafões tem no Centro de S. Pedro um CACI que foi alvo de intervenção no âmbito de um PRR (Investimento RE-C03-I01 - Nova Geração de equipamentos e Respostas Sociais, N.º 15/C03-i01/2025, RE-C03-i01.m01 – Requalificação e alargamento da rede de equipamentos e respostas sociais). A obra está a decorrer, e embora o seu grau de maturidade não seja o que gostaríamos, a obra decorre a bom ritmo e será concluída no período previsto. Esta atual candidatura (N.º 19/C03-i01/2026) vai permitir apetrechar este espaço condignamente, com material que seguramente contribui para melhorar a qualidade de vida e a qualidade dos apoios, sendo duplamente importante: para as pessoas que apoiamos nesta resposta e para os colaboradores que diariamente ali exercem as suas funções. Não obstante do grau de dificuldade das pessoas, a ASSOL usa há muitos anos o Planeamento Centrado na Pessoa, como metodologia de trabalho no CACI e isto dá oportunidade às pessoas de fazerem as suas escolhas, de decidirem as atividades em que querem participar, de frequentarem várias atividades com muita flexibilidade, incluindo no exterior. É também muito interessante verificar que as nossas pessoas apoiadas gostam muito de estar atualizadas ao nível das tecnologias, por isso o PC é uma coisa com que lidam em muitas circunstâncias, dentro das suas capacidades. Para as pessoas com limitações muito severas, é ainda solicitado algum material para apetrechamento de um espaço para maior conforto.O Objetivo geral da ASSOL ao candidatar-se neste aviso é pois, apetrechar o nosso CACI devidamente, por forma a garantir a melhor qualidade de vida, com as melhores tecnologias e equipamentos moveis para que as Pessoas apoiadas e colaboradores gostem de estar na ASSOL e se sintam felizes e satisfeitos.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

80,0
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

124,74 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 70 %,

Where was the money spent

By county

1 county financed .

  • São Pedro do Sul 124,74 thousand € ,
Source EMRP