PRR Project
CRECHE
Project sheet
Name
CRECHETotal project amount
2,11 thousand €Amount paid
0 €Non-refundable funding
2,11 thousand €Loan funding
0 €Start date
05.11.2025Expected end date
30.06.2026Dimension
ResilienceComponent
Social InterventionInvestment
New Generation of Equipment and Social InterventionOperation code
16/C03-i01/2025.PPRR-RE-C03-i01-16-000377Summary
Estando em funcionamento desde o ano de 1999, a Creche Fernãozinho tem atualmente capacidade para 46 crianças, com idades compreendidas entre os 3 meses e os 3 anos (última Revisão do Acordo de Cooperação a 28/08/2023). A Resposta Social carece de remodelação ao nível do sistema de aquecimento, janelas e sistema de renovação de ar, fator determinante para o bem-estar das crianças e colaboradoras e, consequentemente da qualidade dos serviços prestados. Encontra-se licenciada, cumprindo todos os requisitos legais.O investimento a realizar apresenta-se assim como essencial em várias vertentes, a saber:- Criar condições para o recente aumento da capacidade da Resposta Social de Creche em 4 vagas, salas 1 e 2 anos, que a entidade ainda tem dificuldade em dar cumprimento, nomeadamente nos períodos de inverno, pela necessidade de melhorar o conforto térmico versus qualidade do ar nas instalações;- A entidade já possui Acordo de Cooperação para as 46 vagas;- Aumento do conforto e segurança para as crianças e profissionais, da eficiência energética da Resposta Social e respetiva sustentabilidade financeira da resposta social.A entidade tem em fase de execução a Candidatura nº PRR-i09-000137, sendo agora essencial a aquisição de Equipamentos que permitam garantir o adequado apetrechamento em conformidade com o aumento da capacidade, bem como dos espaços comuns, contribuindo para o aumento do conforto, segurança e bem-estar das crianças utentes do estabelecimento.
Beneficiaries
The two types are::
- Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
- Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.
Call for applications
As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.
The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.
Final evaluation score
The components for calculating the assessment score can be found in the selection criteria document mentioned below.
Selection criteria
Beneficiaries
Intermediate beneficiaries
Procurement
Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.
To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.
Geographic distribution
2,11 thousand €
Total amount of the project
Where was the money spent
By county
1 county financed .
-
Figueira da Foz 2,11 thousand € ,