PRR Project
Veículo Elétrico Ligeiro Passageiros Transformação
Project sheet
Name
Veículo Elétrico Ligeiro Passageiros TransformaçãoTotal project amount
25 thousand €Amount paid
17,5 thousand €Non-refundable funding
25 thousand €Loan funding
0 €Start date
14.06.2025Expected end date
31.03.2026Dimension
ResilienceComponent
Social InterventionInvestment
New Generation of Equipment and Social InterventionOperation code
14/C03-i01/2025.PPRR-RE-C03-i01-14-000227Summary
A aquisição de uma viatura elétrica vai permitir melhorar o apoio à mobilidade dos utentes com mobilidade condicionada e com necessidade de deslocações, nomeadamente deslocações a consultas médicas, deslocações aos serviços onde os utentes prestam serviço ou a atividades recreativas que sejam desenvolvidas na região, contribuindo assim de modo muito significativo para o seu bem-estar, potenciando a sua integração no processo de desenvolvimento da região. Será importante para melhorar as estruturas sociais e aumentar a capacidade de resposta de forma a proporcionar serviços permanentes mais adequados à problemática biopsicossocial das pessoas idosas.Por outro lado, trata-se também de uma aposta numa modernização progressiva, com o propósito de prestar cada vez mais e melhores serviços, associada ao desenvolvimento de uma política de promoção e estímulo profissional, de forma a poder manter uma equipa de colaboradores competentes e pró ativos.O concelho do Satão tem uma população de 11.030 habitantes (Sensos de 2021), dos quais 3.369 habitantes têm idade superior a 65 anos. Relativamente aos critérios de mérito considerados neste aviso, esta entidade tem 36 utentes a frequentar a resposta social estrutura residencial para pessoas idosas (ERPI), e 12 residentes a frequentar a resposta social lar residencial.A instituição está localizada em território de baixa densidade.É de salientar que esta entidade presta os seus serviços todos os dias da semana, incluindo fins de semana e feriados.
Beneficiaries
The two types are::
- Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
- Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.
Call for applications
As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.
The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.
Final evaluation score
The components for calculating the assessment score can be found in the selection criteria document mentioned below.
Selection criteria
Beneficiaries
Intermediate beneficiaries
Procurement
Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.
To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.
Geographic distribution
25 thousand €
Total amount of the project
Percentage of the amount already paid for implementing projects
, 70 %,Where was the money spent
By county
1 county financed .
-
Sátão 25 thousand € ,