PRR Project
Veículo Elétrico Ligeiro Passageiros Transformação
Project sheet
Name
Veículo Elétrico Ligeiro Passageiros TransformaçãoTotal project amount
25 thousand €Amount paid
17,5 thousand €Non-refundable funding
25 thousand €Loan funding
0 €Start date
03.09.2025Expected end date
02.03.2026Dimension
ResilienceComponent
Social InterventionInvestment
New Generation of Equipment and Social InterventionOperation code
14/C03-i01/2025.PPRR-RE-C03-i01-14-000157Summary
A ASSOL reúne critérios de elegibilidade de acordo com o aviso de candidatura - Mobilidade Verde Social - Aquisição de veículos elétricos. Também pelo facto de possuirmos a resposta CAO / CACI, para um total de 89 pessoas (59 pessoas na sede da ASSOL - Centro Alexandre Correia e 30 no Centro de S. Pedro do Sul). A ASSOL utiliza uma metodologia de trabalho centrada na comunidade, o que significa que a quase totalidade das pessoas apoiadas realizam atividades no exterior, quer sejam ASU (Atividades Socialmente Úteis) como sejam atividades em instalações públicas (ginásios, piscinas, etc), ou ainda por via do acompanhamento destas pessoas a consultas aos centros de saúde ou ao hospital Central (Viseu). Existem ainda algumas das pessoas que apoiamos que necessitam que a ASSOL os vá buscar / levar a casa, quer seja devido às suas incapacidades de autonomia ao nível das deslocações, quer seja pela ausência de transportes públicos compatíveis. A ASSOL necessita, por isso, sempre de um n.º significativo de viaturas pois o n.º de pessoas em acompanhamento é bastante elevado – podemos afirmar que a totalidade das pessoas apoiadas usufruir dos transportas da ASSOL por algum dos motivos apresentados. Esta viatura contribuirá para continuar a trabalhar o nível de autonomia das pessoas que apoiamos no sentido em que podem ter acesso aos apoios e serviços de que necessitam sem que se tenham de sair dos seus contextos de vida naturais. O facto de ser uma viatura elétrica permitirá também mitigar as alterações climáticas, em alinhamento com o quadro estratégico nacional para a inclusão social.
Beneficiaries
The two types are::
- Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
- Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.
Call for applications
As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.
The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.
Final evaluation score
The components for calculating the assessment score can be found in the selection criteria document mentioned below.
Selection criteria
Beneficiaries
Intermediate beneficiaries
Procurement
Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.
To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.
Geographic distribution
25 thousand €
Total amount of the project
Percentage of the amount already paid for implementing projects
, 70 %,Where was the money spent
By county
1 county financed .
-
Oliveira de Frades 25 thousand € ,