Information portal on various topics of management of public resources of the Portuguese State

Project sheet

Name

Veículo Elétrico Ligeiro Passageiros Transformação

Total project amount

50 thousand €

Amount paid

35 thousand €

Non-refundable funding

50 thousand €

Loan funding

0 €

Start date

10.06.2025

Expected end date

30.06.2026

Dimension

Resilience

Component

Social Intervention

Investment

New Generation of Equipment and Social Intervention

Operation code

14/C03-i01/2025.PPRR-RE-C03-i01-14-000134

Summary

O Instituto de São Miguel é uma Instituição Particular de Solidariedade Social (IPSS) cuja missão é proporcionar apoio de caráter social, educativo e de bem-estar físico, mental e emocional a crianças, jovens e idosos, bem como a todas as pessoas que se encontram sob a sua tutela. A mobilidade é um fator essencial para garantir o acesso contínuo dos utentes aos serviços e atividades fundamentais para a sua qualidade de vida, autonomia e integração social.Atualmente, a frota de veículos do Instituto de São Miguel é insuficiente para responder de forma eficaz às necessidades de transporte das suas respostas sociais, nomeadamente o Apartamento de Autonomização e Casa de Acolhimento, situados no Outeiro de S. Miguel, Guarda, e o Centro de Convívio Santo António - Orca - Alpedrinha - Fundão, onde funciona o Serviço de Apoio Domiciliário com Lar de Idosos e outros serviços associados.A aquisição de uma viatura elétrica ligeira de 5 lugares permitirá à instituição garantir um serviço de transporte mais eficiente e sustentável, beneficiando diretamente os utentes destas respostas sociais. Este veículo possibilitará o transporte regular de jovens quando necessário em processo de autonomização, consultas médicas, evitando a utilização de uma carrinha de 9 lugares que fica assim disponível para outras actividades e transporte de outros utentes; transporte de idosos que necessitam de deslocação para consultas médicas, tratamentos, atividades culturais, apoio domiciliário e outros serviços essenciais.Além disso, a opção por uma viatura elétrica alinha-se com os compromissos ambientais da Instituição, promovendo a sustentabilidade e reduzindo a pegada de carbono, contribuindo assim para um modelo de transporte mais ecológico e eficiente.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

75,0
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

50 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 70 %,

Where was the money spent

By county

1 county financed .

  • Guarda 50 thousand € ,
Source EMRP
24.11.2026
All themes
Transparency without leading