Information portal on various topics of management of public resources of the Portuguese State

Project sheet

Name

Veículo Elétrico Ligeiro Mercadorias Transformação

Total project amount

25 thousand €

Amount paid

17,5 thousand €

Non-refundable funding

25 thousand €

Loan funding

0 €

Start date

30.07.2025

Expected end date

31.03.2026

Dimension

Resilience

Component

Social Intervention

Investment

New Generation of Equipment and Social Intervention

Operation code

14/C03-i01/2025.PPRR-RE-C03-i01-14-000083

Summary

O Centro de Bem Estar Social da Freguesia de Figueira de Lorvão mantem em atividade respostas sociais para pessoas idosas, nomeadamente, duas ERPI (acordos 26 + 12), dois Centro de Dia (acordo 30 + 16) e SAD (acordo 23) em dois equipamentos SEDE (desde 1998) e Pólo de Sazes de Lorvão (desde 2014).Tem celebrado com a Segurança Social acordos de cooperação em todas as respostas sociais que desenvolve, nomeadamente no ERPI, no Centro de Dia e SAD, condição necessária para se poder enquadrar e eleger a candidatura.Nos últimos anos, tem sido preocupação da Direção, aumentar a contribuição desta entidade para a melhoria ambiental, estando tais deliberações definidas no nosso compromisso ambiental, apostando nomeadamente nas energias renováveis:-Já possui no parque automóvel viaturas elétricas-Tem instalado painéis fotovoltaicos para produção de energia em autoconsumo.Julgamos estar no caminho certo no cumprimento do nosso compromisso ambiental e contribuir para a diminuição da nossa pegada ecológica, melhorando assim a sustentabilidade ambiental.A opção pela viatura tipologia I, deriva do fato de ser útil também para o transporte de utentes devido ás características geográficas da nossa área de atuação, onde em alguns locais as viaturas de 9 lugares não conseguem ter acesso. Também é muito útil para o acompanhamento a consultas dos utentes, facilitando nomeadamente ao nível do estacionamento e da poupança.Assim, entende a Instituição reunir as condições de elegibilidade, do presente aviso de abertura e que os objetivos do mesmo vão ao encontro dos objetivos da entidade.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

90,0
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

25 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 70 %,

Where was the money spent

By county

1 county financed .

  • Penacova 25 thousand € ,
Source EMRP
24.11.2026
All themes
Transparency without leading