Information portal on various topics of management of public resources of the Portuguese State

Project sheet

Name

Veículo Elétrico até 7 lugares com Transformação

Total project amount

30 thousand €

Amount paid

21 thousand €

Non-refundable funding

30 thousand €

Loan funding

0 €

Start date

21.03.2025

Expected end date

12.03.2026

Dimension

Resilience

Component

Social Intervention

Investment

New Generation of Equipment and Social Intervention

Operation code

12/C03-i01/2024.PPRR-RE-C03-i01-12-000188

Summary

A Estrutura Residencial para Pessoas Idosas (ERPI) denominado por Lar S. José, presta um conjunto de atividades e serviços aos seus utentes, nomeadamente alimentação adequada às necessidades dos residentes, cuidados de imagem e higiene pessoal, tratamento de roupas, higiene dos espaços, atividades de animação sociocultural, lúdico-recreativas e ocupacionais, apoio no desempenho das atividades da vida diária, cuidados de enfermagem e acesso a cuidados de saúde e assistência religiosa, proporcionando bem estar e qualidade de vida aos seus residentes. A aquisição de uma carrinha elétrica de 7 lugares com transformação para cadeira de rodas irá servir de apoio a esta valência, apresenta como objetivo geral contribuir para a melhoria da qualidade dos serviços prestados, permitindo o transporte ajustado a pessoas com mobilidade reduzida. Por sua vez, irá contribuir para a redução de custos com combustível, assegurando assim uma melhor eficiência no controlo de despesas. Esta aquisição traduz-se como a opção mais eficiente e eficaz como solução de mobilidade em custo e na redução dos gases de efeito de estufa.A instituição apresentou uma candidatura ao Aviso nº 08/C03-i01/2023, a qual aguarda pela Decisão Final, para dotar a instituição de uma viatura elétrica transformada do tipo T1 para servir de apoio à valência de Serviço de Apoio ao Domicílio (SAD).Assim, revela-se de extrema importância dotar a instituição de viaturas 100% elétricas adaptadas às necessidades existentes, para assim conseguir dar um apoio mais diversificado e abrangente a todos os seus utentes e ser mais autónoma no que concerne ao transporte dos utentes nas diversas valências da instituição.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

70,0
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

30 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 70 %,

Where was the money spent

By county

1 county financed .

  • Montalegre 30 thousand € ,
Source EMRP
24.11.2026
All themes
Transparency without leading