Information portal on various topics of management of public resources of the Portuguese State

Project sheet

Name

Veículo Elétrico de 9 lugares com Transformação

Total project amount

40 thousand €

Amount paid

28 thousand €

Non-refundable funding

40 thousand €

Loan funding

0 €

Start date

03.03.2025

Expected end date

31.03.2026

Dimension

Resilience

Component

Social Intervention

Investment

New Generation of Equipment and Social Intervention

Operation code

12/C03-i01/2024.PPRR-RE-C03-i01-12-000004

Summary

O Centro Paroquial e Social de Lanheses é uma Instituição Particular de Solidariedade Social que dá resposta às necessidades sentidas pela população abrangida, crianças e idosos. A instituição desenvolve a sua atividade através de quatro respostas sociais, Serviço de Apoio Domiciliário, Creche, Estrutura Residencial para Pessoas Idosas (ERPI) e Centro de Dia (CD). A ERPI e CD do CPSL conta, conjuntamente, com uma capacidade instalada para 60 utentes, tendo sentido um aumento superlativo da procura por parte de populações limítrofes e não limítrofes a Lanheses, nomeadamente, Montaria, Amonde, Nogueira, Vilar de Murteda, Orbacém, Dem, Gondar, Vitorino das Donas e Geraz do Lima.O Centro Paroquial e Social de Lanheses está ainda, em conjunto com a Câmara Municipal de Viana do Castelo, a preparar a construção de um novo Centro de Dia, na localidade de Montaria, concelho de Viana do Castelo, e cuja abertura se prevê para o final do ano de 2025. Esta nova resposta dará cobertura a uma área geográfica totalmente desprotegida, compreendida entre as regiões sudoeste e noroeste dos concelhos de Caminha e Viana do Castelo, respetivamente.Indo de encontro aos objetivos associados à pegada carbónica, e no sentido de se melhor capacitar e dar qualitativa resposta a novas solicitações e alargamento da resposta de CD, o CPSL necessita, de facto, aumentar a sua de frota. Assim a oportunidade gerada pela operação Mobilidade Verde - Aquisição de Viaturas Elétricas representa uma grande oportunidade e, crendo na sua boa resolução, uma grande mais-valia.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

50,0
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

40 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 70 %,

Where was the money spent

By county

1 county financed .

  • Viana do Castelo 40 thousand € ,
Source EMRP
24.11.2026
All themes
Transparency without leading