Information portal on various topics of management of public resources of the Portuguese State

Project sheet

Name

Cavalões + Acessível

Total project amount

13 thousand €

Amount paid

6,5 thousand €

Non-refundable funding

13 thousand €

Loan funding

0 €

Start date

01.09.2025

Expected end date

31.12.2025

Dimension

Resilience

Component

Social Intervention

Investment

360° Accessibility

Operation code

11/C03-i02/2025.P16528

Summary

O edifício alvo de intervenção é referente ao edifício da junta freguesia de Cavalões.Foram identificadas diversas patologias no âmbito das acessibilidades para pessoas com mobilidade reduzida, que dificultam a sua utilização. Assim sendo existe a necessidade de uma intervenção, de forma a cumprir as normas técnicas de acessibilidade e mobilidade, previstas no Decreto-Lei 163/2006 de 8 de agosto. O acesso desde a via pública até à entrada principal do edifício é feito diretamente do passeio apenas por um lance de escadas que vence uma cota de 1,30m. No interior do edifício verificou-se que as instalações sanitárias existentes não possuem dimensões nem equipamentos acessíveis. As portas interiores não possuem largura livre necessária. É proposta a criação de uma rampa de acesso desde o portão de acesso pedonal até à entrada do edifício. Para vencer esta diferença de cotas é necessário uma rampa de grandes dimensões e excecionalmente será proposto um lance com comprimento de 6,55m e uma inclinação de 10%, de forma a que a rampa se integre nas condicionantes do edifício. Terá corrimão em inox de ambos os lados com altura máxima nunca superior a 90cm e dois patamares de descanso. Será feita a reformulação das instalações sanitárias, de forma a poderem ser utilizadas por pessoas com mobilidade reduzida. Para isso serão alteradas as portas, serão removidos os urinóis e alterada a disposição dos lavatórios e sanitas. Além disso todas as loiças serão substituídas por outras adequadas. As portas interiores serão adaptadas para que tenham todas uma largura livre de 80cm. Face ao exposto, consideram-se cumpridas todas as disposições técnicas aplicáveis. Para a boa execução do projeto é necessário contemplar a alteração da rede de águas e esgotos nas instalações sanitárias.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

90,0
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

13 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 50 %,

Where was the money spent

By county

1 county financed .

  • Vila Nova de Famalicão 13 thousand € ,
Source EMRP
24.11.2026
All themes
Transparency without leading