PRR Project
Melhoria da Acessibilidade – Parque infantil de Côrtes (Sr.ª da Cabeça)
Project sheet
Name
Melhoria da Acessibilidade – Parque infantil de Côrtes (Sr.ª da Cabeça)Total project amount
13 thousand €Amount paid
6,5 thousand €Non-refundable funding
13 thousand €Loan funding
0 €Start date
31.10.2024Expected end date
31.12.2025Dimension
ResilienceComponent
Social InterventionInvestment
360° AccessibilityOperation code
11/C03-i02/2025.P16391Summary
DE FORMA A SUPRIR A NECESSIDADE IDENTIFICADA, PROPÕE-SE CRIAR UM LUGAR DE ESTACIONAMENTO RESERVADO A P.M.C. (QUE SERÁ O PONTO DE ACESSO) ADJACENTE E PARALELO À VIA DE CIRCULAÇÃO AUTOMÓVEL MAIS PRÓXIMA DA ENTRADA DO PARQUE INFANTIL. O REFERIDO LUGAR DE ESTACIONAMENTO TERÁ AS DIMENSÕES DE 5,0X2,5m E FAIXA LATERAL COM 1,0m DE LARGURA E SERÁ DOTADO DE SINALIZAÇÃO HORIZONTAL E VERTICAL ADEQUADA A ASSINALAR O LUGAR DE FORMA BEM VISÍVEL DE ACORDO COM O DISPOSTO NA NTA 2.8. PROPÕE-SE PAVIMENTAR O REFERIDO LUGAR DE ESTACIONAMENTO EM BETÃO POROSO (MATERIAL PERMEÁVEL E ANTIDERRAPANTE) E DEMARCAR OS SEUS LIMITES BEM COMO OS LIMITES DA FAIXA DE ACESSO LATERAL, ATRAVÉS DE LINHAS PINTADAS NO PISO EM COR CONTRASTANTE COM A DA RESTANTE SUPERFÍCIE, PINTANDO NA MESMA COR O SÍMBOLO INTERNACIONAL DE ACESSIBILIDADEC/ LARGURA MÍNIMA DE 1,0m.PROPÕE-SE PAVIMENTAR EM BETÃO POROSO (MATERIAL PERMEÁVEL E ANTIDERRAPANTE) E DELIMITAR COM GUIAS EM BETÃO PRÉ-FABRICADO, UM PERCURSO QUE PERMITA UMA CIRCULAÇÃO PEDONAL ACESSÍVEL A P.M.C. (CUMPRINDO O DISPOSTO NA NTA 1.8) ENTRE A ENTRADA DO PARQUE INFANTIL E O LUGAR DE ESTACIONAMENTO RESERVADO A P.M.C. QUE SE PROPÕE ADJACENTE AO ARRUAMENTO PAVIMENTADO MAIS PRÓXIMO. NA ENTRADA DO PARQUE INFANTIL SERÁ ELIMINADO O RESSALTO DE PISO EXISTENTE. O PAVIMENTO PROPOSTO EM BETÃO POROSO SUBSTITUIRÁ TAMBÉM A SUPERFÍCIE EM RELVA SINTÉTICA EXISTENTE NA ENTRADA DO PARQUE INFANTIL JÁ DENTRO DO MESMO, POR SE TRATAR DE UMA SUPERFÍCIE QUE NÃO SE CONSIDERA ACESSÍVEL A PMC.DE FORMA A ELIMINAR A EXISTÊNCIA DE JUNTAS NO PAVIMENTO E GARANTIR UMA SUPERFÍCIE CONTÍNUA CUMPRINDO O DISPOSTO NA NTA 4.7, EM 2024 FORAM EXECUTADAS OBRAS AO NÍVEL DOS PAVIMENTOS DO PARQUE INFANTIL, OBRAS ESSAS EM QUE SE PROCEDEU À SUBSTITUIÇÃO DO PAVIMENTO EXISTENTE EM PLACAS POR PAVIMENTO AMORTECEDOR DE SEGURANÇA INSITU SBR EM VÁRIAS ESPESSURAS RESPEITANDO A HIC DOS EQUIPAMENTOS INFANTIS, SEGUNDO A NORMA EN1176, QUE SE TRATA DE UM REVESTIMENTO CONTÍNUO, SEM JUNTAS, DURÁVEL E QUE GARANTE UMA BOA ADERÊNCIA NA PRESENÇA DE HUMIDADE OU ÁGUA.
Beneficiaries
The two types are::
- Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
- Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.
Call for applications
As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.
The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.
Final evaluation score
The components for calculating the assessment score can be found in the selection criteria document mentioned below.
Selection criteria
Beneficiaries
Intermediate beneficiaries
Procurement
Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.
To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.
Geographic distribution
13 thousand €
Total amount of the project
Percentage of the amount already paid for implementing projects
, 50 %,Where was the money spent
By county
1 county financed .
-
Monção 13 thousand € ,