Project sheet

Name

CRECHE

Total project amount

115,52 thousand €

Amount paid

34,66 thousand €

Non-refundable funding

115,52 thousand €

Loan funding

0 €

Start date

15.04.2025

Expected end date

31.03.2026

Dimension

Resilience

Component

Social Intervention

Investment

New Generation of Equipment and Social Intervention

Operation code

09/C03-i01/2023.PPRR-RE-C03-i01-09-000139

Summary

Remodelação e aumento da capacidade da Resposta Social Creche Infante D. Pedro, situada na Estrada Nacional nº 111, Rua Santo António do Salgueiro, freguesia de Tentúgal, Concelho de Montemor-o-Velho.Estando em funcionamento desde o ano de 1995, a Resposta Social de Creche está instalada no edifício Infante D. Pedro e tem atualmente capacidade para 45 crianças, entre os 3 meses e os 3 anos. O Edifício integra ainda o Jardim de infância, atualmente com capacidade para 60 crianças, com idades compreendidas entre os 3 e os 6 anos. A candidatura apresentada destina-se a aumentar a capacidade da Creche em mais 16 vagas e melhorar as condições de conforto, segurança e eficiência energética do edifício através: Revestimento do edificado em madeira – parede exterior com régua em PVC, janelas, portas e soleiras; Substituição total de sistemas de drenagem de águas pluviais instaladas em toda a cobertura do edifício; Instalação de KIT solar Fotovoteico produção de energia para consumo no edifício; Substituição do Portão de acesso ao edifício – colocação de portão automático para acesso à resposta social; Colocação de gradeamento novo para circunscrição do recreio; Sala de 5 anos - Substituição de divisória degradada por uma nova (entre refeitório e a sala de atividades).A freguesia de Tentúgal, desde o início da década de 90, concentra algumas unidades fabris e, ainda hoje, tem em funcionamento uma das maiores Unidades do Concelho. Tem também uma intensa atividade comercial associada a fabrico de pasteis de Tentúgal, empregando maioritariamente mão de obra feminina, aspeto que levou a entidade a aí instalar o maior Centro da AFMP no ano de 1995.Como Objetivos da Candidatura define-se assim:- Aumentar a capacidade em 16 utentes da Resposta Social de Creche na sede de Concelho;- Melhorar as condições de segurança e conforto para utentes e equipa de profissionais;- Aumentar a eficiência energética do edifício contribuindo para a diminuição da pegada ecológica e, simultaneamente a diminuição de consumos energéticos;- Contribuir para a sustentabilidade financeira da Resposta Social Creche, pela diminuição dos custos de funcionamento e aumento das receitas.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

80,0
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

115,52 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 30 %,

Where was the money spent

By county

1 county financed .

  • Montemor-o-Velho 115,52 thousand € ,
Source EMRP
22.05.2026