Name

Cemitério de Fornelo + Acessível

Total project amount

13 thousand €

Amount paid

6,5 thousand €

Non-refundable funding

13 thousand €

Loan funding

0 €

Start date

01.02.2025

Expected end date

31.05.2025

Dimension

Resilience

Component

Social Intervention

Investment

360° Accessibility

Operation code

08/C03-i02/2024.P13364

Summary

O projeto proposto cumpre os parâmetros técnicos atuais e validos para além do decreto-lei 163/2006 de 8 de agosto, que é específico para a acessibilidade e mobilidade.De forma a resolver a diferença de cotas entre o exterior e o interior do edifício é proposta a retificação da cota do patamar de chegada, anterior à porta de entrada. Irá subir cerca de 15cm até que a diferença de cotas entre o interior e o exterior seja de apenas 2cm (altura da soleira).Esta alteração implica trabalhos complementares, tais como a construção de rampas para vencer a diferença de cotas criada. Serão executadas duas rampas com 6% e 7% de inclinação, com um patamar intermédio que faz a ligação às escadas de acesso à via pública. De forma a manter uma altura de degraus uniforme serão efetuadas alterações nos degraus existentes, passando a ter cada um 18cm de altura por 40cm de patamar.Serão demolidas as paredes interiores das duas instalações sanitárias e construídas novas, de forma a que se criem compartimentos com dimensões adequadas. As loiças sanitárias serão colocadas de forma adequada para que seja possível inscrever dentro das instalações sanitárias um espaço de manobra e espaço de permanência para cadeira de rodas.O espaço de arrumos será convertido em espaço técnico para utilização do técnico de profundidade (coveiro). Para isso será instalada uma base de duche e um armário para arrumos.Todas as portas serão retificadas e terão medidas regulamentares nunca inferiores a 80cm sem obstruir qualquer manobra de rotação com a sua abertura.As portas de entrada serão todas retificadas de forma a que a largura livre seja de pelo menos 80cm.O restante percurso acessível é todo facilitado e de nível, são asseguradas as dimensões mínimas para o percurso acessível e todos os compartimentos permitem o acesso a pessoas com mobilidade condicionada.Face ao exposto, consideram-se cumpridas todas as disposições técnicas aplicáveisTrabalhos complementares:Para a boa execução do projeto é necessário contemplar a alteração da rede de águas e esgotos nas instalações sanitárias.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

80,0
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

13 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 50 %,

Where was the money spent

By county

1 county financed .

  • Vila do Conde 13 thousand € ,
Source EMRP