Project sheet

Name

Mais Acessibilidade na sede da JF Mira

Total project amount

13 thousand €

Amount paid

13 thousand €

Non-refundable funding

13 thousand €

Loan funding

0 €

Start date

01.11.2024

Expected end date

31.03.2026

Dimension

Resilience

Component

Social Intervention

Investment

360° Accessibility

Operation code

08/C03-i02/2024.P13363

Summary

A Junta de Freguesia de Mira debatia-se há bastante tempo com a necessidade de encontrar um novo espaço para a sua sede de forma a ter condições condignas para a prestação de serviços à população.Em 2022, o imóvel onde funcionaram as Finanças em Mira, passou para a posse o Município de Mira por um período de 50 anos, na sequência de um acordo entre o Governo e este município. Nesse seguimento, a autarquia cedeu o referido espaço à Junta de Freguesia de Mira para instalação da sua nova sede através da formalização de um protocolo com duração idêntica, permitindo dotar esta freguesia de um espaço com melhores condições de utilização para todos. O imóvel corresponde a uma fração (composta por r/ch e primeiro andar, em que o r/ch tem acesso direito à rua) que foi construída ao abrigo da anterior legislação. Como se verifica no plano de acessibilidades, foram contempladas todas as medidas no que toca à acessibilidade, nomeadamente as referentes à largura de portas, soleira da porta de entrada, atendimento feito em secretária e não em guichet ou balcão e à criação de instalação sanitária no primeiro andar para pessoas com mobilidade reduzida e também a instalação de uma plataforma elevatória, que permita ao acesso de pessoas com mobilidade condicionada ao primeiro andar.Todas as intervenções previstas no plano de acessibilidades e que são necessárias para o total cumprimento do Decreto – Lei nº 163/06 foram realizadas, faltando apenas a instalação de meios de acesso ao primeiro piso onde se encontra, nomeadamente, as instalações sanitárias de apoio à mobilidade reduzida e as salas polivalentes da junta de freguesia.Assim, com o presente projeto pretende-se proceder à instalação da referida plataforma (Medidas da Plataforma 1000x800, com capacidade para suportar peso até 300kgs), . O valor deste investimento é de 16.415,09 sem Iva, tendo a Junta de Freguesia capacidade para solver a componente não coberta pelo apoio resultante desta candidatura.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

90,0
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

13 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 100 %,

Where was the money spent

By county

1 county financed .

  • Mira 13 thousand € ,
Source EMRP
24.11.2026