Name

Melhoria Acessibilidade Junta Freguesia de Gebelim e Soeima

Total project amount

13 thousand €

Amount paid

6,5 thousand €

Non-refundable funding

13 thousand €

Loan funding

0 €

Start date

01.01.2025

Expected end date

01.12.2025

Dimension

Resilience

Component

Social Intervention

Investment

360° Accessibility

Operation code

08/C03-i02/2024.P12493

Summary

As ações a levar a cabo no projeto de Melhoria da Acessibilidade da Junta de Freguesia de Gebelim e Soeima, inicialmente é necessário realizar um projeto detalhado de forma a adequar o edifício à conformidade das regulamentações de acessibilidade locais, destacam-se na fase inicial, a elaboração do Plano de acessibilidade de acordo com o artigo. 3º do Decreto-Lei n.º 163/2006, de 08 de agosto, bem como os desenhos explícitos e claros por NTA aplicada na área a intervencionar. Em fase de execução das adaptações as ações e investimentos são simultâneos. A construção de instalações sanitárias acessíveis, é crucial para atender às necessidades de pessoas com deficiência e mobilidade reduzida. Isso envolve a construção de instalações sanitárias acessíveis com espaço adequado para cadeiras de rodas, barras de apoio e pias acessíveis. Outra ação/investimento a levar a cabo no presente projeto, é a instalação de uma rampa acessível que permita a entrada de cadeiras de rodas e facilite o acesso de pessoas com mobilidade reduzida. O investimento em causa envolve a construção de uma rampa com inclinação adequada. Depois de realizado o investimento destacam-se como principais ações: a instalação de sinalização clara e acessível em todo o edifício para direcionar as pessoas para as instalações acessíveis, incluindo a rampa e instalações sanitárias; Todos os funcionários do edifício receberão formação adequada para atender às necessidades das pessoas com deficiência e para usar corretamente os equipamentos e instalações acessíveis; será ainda definido um programa de manutenção regular, de forma a garantir que todas as instalações e equipamentos acessíveis estejam em perfeitas condições de funcionamento.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

100,0
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

13 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 50 %,

Where was the money spent

By county

1 county financed .

  • Alfândega da Fé 13 thousand € ,
Source EMRP
24.11.2026
All themes